Laserfiche WebLink
ATC SITE SAFETY PLAN <br /> On-site communications: ❑ Radio O Verbal ❑ Hand Signals <br /> ❑ Other <br /> Designate hand signals here: <br /> Off-site communications: ❑ Radio O Telephone <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site prior to beginning work activities. <br /> MARK EVACUATION ROUTE(S) ON SITE MAP L7 CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal protective equipment <br /> (i.e., gloves, coveralls) will be placed in a disposal <br /> bin <br /> Location of Wash Water., Restroom at adjacent construction site, water on rig or truck <br /> Location of Toilet., Restroom at adjacent construction site or nearby gas station <br /> Location of Drinking Water: ATC truck <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP O CHECK WHEN <br /> DONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored <br /> on-site until appropriate disposal methods <br /> are determined. <br /> PAGE 11 <br />