My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DARCY
>
500
>
2900 - Site Mitigation Program
>
PR0507889
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 11:21:42 AM
Creation date
6/28/2019 3:42:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507889
PE
2953
FACILITY_ID
FA0007823
FACILITY_NAME
CROSSROADS COMMERCE CENTER
STREET_NUMBER
500
STREET_NAME
DARCY
STREET_TYPE
PKWY
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
500 DARCY PKWY
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kT ew <br /> analyzed for TPHd and TPHg using13P4 Method 8015 modified, BTEX using EPA Method <br /> 8020, and MTBE using EPA Method K20'�aW d <br /> Report Preparation <br /> Upon completion of all field activities, a summary report will be prepared for submittal to San <br /> Joaquin County Public Health Services, Environmental Health Department. The report will <br /> include a description of all field activities, laboratory analytical results, boring logs, and <br /> recommendations. <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. A completed Site Safety Plan (SSP) is contained in Attachment <br /> 1 and a Quality Control/Quality Assurance Plan is contained in Attachment 2. All field work will <br /> be completed in accordance with these plans. <br /> Proiected Schedule <br /> Once approval of this workplan has been received, ATC will schedule drilling activities <br /> immediately. Because the presence of impacted soil and groundwater is delaying construction <br /> activity at the site, ATC would like to complete investigation and remediation activities as soon as <br /> possible. It is anticipated the drilling will be completed in one day and drilling. ATC will notify <br /> PHS/EHD prior to beginning any field activities. The summary report will be submitted to <br /> PHS/EHD approximately four to five weeks after the completion of field activities. <br /> If you have any questions or require additional information regarding this workplan, please <br /> contact us at (209) 579-2221. <br /> Respectfully Submitted, QFES$/ <br /> ATC Associates Inc. QF �Nq <br /> i NN <br /> MGPili SEY <br /> m <br /> Jeanne Homsey, P.E. No.C047410 <br /> Registered Engineer No. C47410 Exp' /1/99 7tc <br /> CIVIL a�P <br /> Attachments <br /> cc: Mr. Dave Henry, Hazard Management Consulting, Inc. <br /> wA822544orkplan.doc 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.