My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011593
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DARCY
>
500
>
2900 - Site Mitigation Program
>
PR0507889
>
ARCHIVED REPORTS XR0011593
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 11:51:17 AM
Creation date
6/28/2019 3:44:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011593
RECORD_ID
PR0507889
PE
2953
FACILITY_ID
FA0007823
FACILITY_NAME
CROSSROADS COMMERCE CENTER
STREET_NUMBER
500
STREET_NAME
DARCY
STREET_TYPE
PKWY
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
500 DARCY PKWY
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK REQUEST FORM <br /> Dat f Request: 4/ 1 i D 9 <br /> Date o q 0 0 198 Requested Completion ate. 041021 8 <br /> !, Proj Name: D'Arcy Parkway Proj No: 82254.0001 <br /> Site Address: _End. of D'Arcy Parkway, Lathrop, CA Task: <br /> Project Manager: Jeanne Homsev Field Person: T. Lutterman <br /> Client Contact:_ Dave Henry _ Phone No: 714 587-0340 <br /> 1i <br /> Site Contact: Don Styles Phone No: 209 481-2735 <br /> Regulatory Contact: Steve Sasson Phone No: 209-468-3459 <br /> ' Approval: Completion Date: 41zham <br /> NPNotify re ulator rior to site work. moo— :51 <br /> Meet Evergreen Oil on site at 7:30am have vacuum truck remove as much water <br /> ' from the excavation as possible, no solids. Truck capacity 5,000 gallons <br /> The excavator operator will be on site at 8:00 am. _ <br /> ' Excavate as much of the vertical extent of impacted soil as possible. Prevous <br /> results indicate soil is impacted below 14 feet bgs. <br /> ' Stockpile soil on site north of roadway_(Don Styles can show you where,_ <br /> Monitor soil and excavation with PID. <br /> ' Collect confirmation soil samples from bottom,of excavation, at least two. _ <br /> Collect confirmation soil samples from sidewalls (previously collected at 14 feet} <br /> try tom deeper). <br /> ' One vacuum truck from Evergreen Oil will be back on site around 3:00 to extract <br /> groundwater from the excavation. A second truck will also be at the site but may <br /> be later than 3:00. If it looks like recharge .is too slow we can cancel 2nd truck <br /> Collect confirmation groundwater sample from pit <br /> Samples to Sequoia Analytical. 2-H hr `fPrT <br /> Sample for BTEX/TPHg, TPHd_, and fuel oxygenates <br /> Take measurements of excavation from hydrant) and secure site <br /> w A82264%workord.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.