Laserfiche WebLink
California Wional Water Quality Colo Board <br /> Central Valley Region v ' <br /> Katherine Hart, Chair ` <br /> Linda S. Adams 11020 Sun Center Drive#200, Rancho Cordova, California 95670-6114 Arnold <br /> Secretary/or Phone(916)464-3291 • FAX (916)464-4645 Schwarzenegger <br /> Environmental P- <br /> Protection http://www.waterboards.ca.gov/centralvalley UJB Governor <br /> J i <br /> 17 March 2010 <br /> Jim Wood 3 CERTIFIED MAIL <br /> 14250 N. De Vries Road /�'� ' �� �� 7009 1410 0002 1421 7935 <br /> Lodi, CA 95240 '5 6(0ov�Z / <br /> ZS yoi o <br /> APPROVAL OF MONITORING WELL INSTALLATION AND SAMPLING PLAN,WOODS <br /> DAIRY, 14250 N. DE VRIES ROAD, LODI, SAN JOAQUIN COUNTY <br /> Central Valley Regional Water Quality Control Board (Central Valley Water Board) staff has <br /> reviewed the revised Monitoring Well Installation and Sampling Plan (MWISP), dated 1 March <br /> 2010. The revised plan incorporates comments discussed in a 9 February 2010 meeting <br /> between Daniel Davis and Patrick Dunn of Dunn Environmental, Inc. The revised MWISP is <br /> approved. A Monitoring Well Installation Completion Report and the results of the initial <br /> groundwater sampling are due to the Central Valley Water Board within 45 days of the date of <br /> well completion. <br /> If you have questions, please contact Daniel Davis at (916) 464-4739. <br /> Pamela C. Creedon <br /> Executive Officer <br /> cc: Patrick F. Dunn, Dunn Environmental, Inc., 5060 Robert J. Mathews Pkwy, Suite 2, EI <br /> Dorado Hills, CA 95762 <br /> California Environmental Protection Agency <br /> CaRecycled Paper <br />