My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
14250
>
2900 - Site Mitigation Program
>
PR0535173
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 1:13:37 PM
Creation date
7/2/2019 1:09:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0535173
PE
2965
FACILITY_ID
FA0020331
FACILITY_NAME
WOODS DAIRY
STREET_NUMBER
14250
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05524026
CURRENT_STATUS
01
SITE_LOCATION
14250 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Wional Water Quality Colo Board <br /> Central Valley Region v ' <br /> Katherine Hart, Chair ` <br /> Linda S. Adams 11020 Sun Center Drive#200, Rancho Cordova, California 95670-6114 Arnold <br /> Secretary/or Phone(916)464-3291 • FAX (916)464-4645 Schwarzenegger <br /> Environmental P- <br /> Protection http://www.waterboards.ca.gov/centralvalley UJB Governor <br /> J i <br /> 17 March 2010 <br /> Jim Wood 3 CERTIFIED MAIL <br /> 14250 N. De Vries Road /�'� ' �� �� 7009 1410 0002 1421 7935 <br /> Lodi, CA 95240 '5 6(0ov�Z / <br /> ZS yoi o <br /> APPROVAL OF MONITORING WELL INSTALLATION AND SAMPLING PLAN,WOODS <br /> DAIRY, 14250 N. DE VRIES ROAD, LODI, SAN JOAQUIN COUNTY <br /> Central Valley Regional Water Quality Control Board (Central Valley Water Board) staff has <br /> reviewed the revised Monitoring Well Installation and Sampling Plan (MWISP), dated 1 March <br /> 2010. The revised plan incorporates comments discussed in a 9 February 2010 meeting <br /> between Daniel Davis and Patrick Dunn of Dunn Environmental, Inc. The revised MWISP is <br /> approved. A Monitoring Well Installation Completion Report and the results of the initial <br /> groundwater sampling are due to the Central Valley Water Board within 45 days of the date of <br /> well completion. <br /> If you have questions, please contact Daniel Davis at (916) 464-4739. <br /> Pamela C. Creedon <br /> Executive Officer <br /> cc: Patrick F. Dunn, Dunn Environmental, Inc., 5060 Robert J. Mathews Pkwy, Suite 2, EI <br /> Dorado Hills, CA 95762 <br /> California Environmental Protection Agency <br /> CaRecycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.