|
V �1Flow 3 kk E • �i KLEINFELDER.,
<br /> it should be.noted our services will 'riot}include: 1 review of ; ro ect plans and
<br /> L711
<br /> cry ° specifications with respect to local codes or. reports prepared for the site 01 project; (2)'.' '
<br /> supervision, direction, or acceptance of the: contractor's kwork; (3) interpretation or
<br /> 4modification of the project pians or specifications; (4) submittal of test results or reports to
<br /> ti s X44 ' ::i any regulatory agency unless specifically requested by the client in,writing and prior to the
<br /> J.
<br /> t - b f
<br /> : start of work); or (5) o -site sa ety.
<br /> i Task 6:-Report of Findings
<br /> Upon completion of field activities'arid receipt of the analytical.resbIts, a report of findings
<br /> will be:prepared for client and agencyy review. The soil assessment report will present our,;,
<br /> r ' field observations and assessment of-the, analytical results. :Kleinfelder=:may recommend
<br /> i additional soil assessment or remediation alternatives-as warranted. y„
<br /> 'PROJECT SCHEDULE "' �tl g
<br /> 4.kf a�'r,' », f .. ��..c t .#'i,.. i �, ..• � ,.� '� r .,.: -,w---'"+ - , _-,� •;ir u,. .: i.
<br />>r� Kleinfelder understands that SJCEHD wishes to have the affected soil beneath the former
<br /> r' a Tankation. removed as quickly as'�possible.. 'A work<plan has been:requested by
<br /> ' #3 loc „
<br /> } „4 ;SJCEHD by'3une 20;..1991, but �t is our:understanding that ail extension:has been granted e _
<br /> _. based on the"'complexity of the project.';-Up"on authorization-to proceed.Meinfelder will
<br /> F t} 7 1.' prepare and submit a work plan to.SJCEHD for their review and consideration;
<br /> Our field staff will be available to -colleoit`ex,cavation samples within one to. two weeks of
<br /> approvalof `the work plan and, receiving authorization to proceed by-',,S M-13, The
<br /> 1proposed'scope of work for soil assessment will require approxFinately'six.to eight weeks to
<br /> 1complete. from. date of authorization fromi SJCDG and. SJCEIID. ` Rush.laborato
<br /> (;turnaround is'available for-an additional analytical char a 1' ry'
<br /> f
<br /> ` r "
<br /> PROJECT COST ESTIMATE
<br /> Task 1 Work Plan Preparation, ff
<br /> ' ';Professional Services',, e 5 S1,935
<br /> Subtotal Task 1 $1,935
<br /> z
<br /> Task 2 Geotechnical Services and Re ort Pre aration
<br /> Professional Services , $2,4201.
<br /> Equipment and Materials qt,
<br /> f 45
<br /> Subtotdl Task 2 . . a. $2,465 �•. J
<br /> }
<br /> Task.3 Excavation and Sampling
<br /> z{ Y° W Professional Services> $1,365. r
<br /> Excavator and Operator, ,� $2 100
<br /> k :
<br /> Fencing Costs :� r� a, "$530
<br /> Equipment and Materials ! $331
<br /> 1 jyg Laboratory Analysis*. 1, 1620
<br /> ' (2 soil samples at $820/sample)
<br /> TP -1 extractable, Oil and Grease
<br /> ;f , EPA 8010, EPA 8020 .. I; -
<br /> ' Metals: cadmium, chromiuin,'4ead, and zinc F
<br /> ,Subtotal Task 2 $5,946
<br /> �VF2791-19 yr 4
<br /> c „Copyright;1991 K14infetder, Inc: " .
<br />
|