Laserfiche WebLink
ItI <br /> CONDOR EARTH PROJECT: BNSF-Proposed Roof Structure <br /> TECHNOLOGIES,INC. CLIENT11 Steel Construction PROJECT NO.: 6600 <br /> CONDOR' 209-234-0518 PROJECT LOCATION 801 Diamond Street Stockton California <br /> FAX 209-234-0538 LOCATION: West End of Roof Structure <br /> DRILLER: West Coast Exploration ELEVATION: <br /> LOG OF BORING DRILLING METHOD: 4"Solid Stem Auger LOGGED BY: R Lona <br /> No. SB-3 DEPTH TO-WATER> INITIAL. Q DATE: 04/17/13 <br /> AFTER DRILLING: : CAVING> -C <br /> nv E <br /> Description E z ° o Z ZD o = N d i2 <br /> C7 m m U a m a c 5:5 # F <br /> 0 U O <br /> 0-0.8"Loose Aggregate, Miscellaneous Nuts, <br /> d CL Washers,and Bolts <br /> m 1.5'-16.5'LEAN CLAY,Dark Brown,Very Stiff,l <br /> > Moist,Highly Plastic <br /> e <br /> e s 4' Color Change to Reddish Brown; Some Fine Sand <br /> 8 21 15.5 99.8 <br /> c 1 13 <br /> a 20 <br /> m <br /> m° <br /> m <br /> 10 <br /> m <br /> ° 72 26 <br /> o" 11'Color Change to Tan 2 21 <br /> = 21 <br /> ° <br /> 0 <br /> c° <br /> n <br /> c <br /> 15 <br /> 15'Becomes Hard <br /> ° a 31 <br /> 3 3 <br /> � 18 <br /> 6 Boring Terminated at 16.5 ft. <br /> S <br /> a <br /> _ <br /> 0 <br /> _c 20 <br /> L <br /> d <br /> a <br /> 0 <br /> m <br /> E <br /> 0 <br /> `c <br /> N <br /> 2 25 <br /> 30 <br /> 35 <br />