My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DIAMOND
>
801
>
2900 - Site Mitigation Program
>
PR0540098
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 12:19:23 PM
Creation date
7/3/2019 9:53:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0540098
PE
2960
FACILITY_ID
FA0022925
FACILITY_NAME
BNSF RAILWAY MORMON RAIL YARD
STREET_NUMBER
801
STREET_NAME
DIAMOND
STREET_TYPE
ST
City
STOCKTON
Zip
95205-7019
CURRENT_STATUS
01
SITE_LOCATION
801 DIAMOND ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Mike Makerov - 2 - 25 January 2017 <br /> four weeks later. If saturated soils are present in March, Central Valley Water Board staff <br /> advise postponing the work until drier conditions are present. <br /> Central Valley Water Board staff conditionally concur with the Work Plan provided the following <br /> elements are implemented: <br /> 1) Transmit the LIF logs of the first two transects, a diagram of the boring locations for the <br /> second two transects and the rationale to Central Valley Water Board staff for <br /> concurrence. <br /> 2) Postpone the work plan implementation if soils are saturated. <br /> 3) Notify Central Valley Water Board staff of the work plan dates prior at least 7 days prior <br /> to implementing field work. <br /> The report of results will include interpretation and recommendations for follow-up work. If the <br /> work proceeds in March, please provide a Report of Results by 5 May 2017. If weather delays <br /> the work, Central Valley Water Board staff will revise the Report of Results schedule. <br /> Thank you for proposing this technology for refining the assessment of diesel in the subsurface. <br /> Central Valley Water Board staff look forward to seeing the fuel distribution through the lense of <br /> laser induced flourescence. If you have any questions, you may contact me by email at <br /> A y.Terrell@Waterboards.ca.gov or by telephone at (916) 464-4680. <br /> AMY TERRELL, P.E. <br /> Federal and Private Sites Cleanup Unit. <br /> cc: Mr. Nuel Henderson, San Joaquin County Environmental Health Dept., Stockton <br /> Ms. Laura Kennedy, Kennedy/Jenks Consultants, San Francisco <br />
The URL can be used to link to this page
Your browser does not support the video tag.