My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DIAMOND
>
801
>
2900 - Site Mitigation Program
>
PR0540098
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 11:40:38 AM
Creation date
7/3/2019 9:53:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540098
PE
2960
FACILITY_ID
FA0022925
FACILITY_NAME
BNSF RAILWAY MORMON RAIL YARD
STREET_NUMBER
801
STREET_NAME
DIAMOND
STREET_TYPE
ST
City
STOCKTON
Zip
95205-7019
CURRENT_STATUS
01
SITE_LOCATION
801 DIAMOND ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
safety action plan confmnatiage • Page 3 of 4 <br /> yes Job Safety Briefings will include emergency preparedness information. <br /> yes Copies of Material Safety Data Sheets(MSDSs)for hazardous materials will be provided to the BNSF Project <br /> Representative and be maintained on-site. <br /> Identify Responding Agencies <br /> Agency Telephone Est.Resp.Time <br /> Medical St.Josephs Med Cntr 209-943-2000 10 min. <br /> Fire Stockton ED 911 <10 min <br /> Police Stockton PD 911 <10min <br /> Verify communications: landline radio YES cellular telephone <br /> Employee assigned to make call and his/her back-up Mike McLeod <br /> Backup employee to also make the call Cameron Ross <br /> The below statements must be checked and implemented within you safety plan;by checking these statements you <br /> affirm that they will be accomplished.This Safety Action Plan will not be accepted unless these are checked. <br /> YES First Aid and CPR trained employees will be at the job-site(s)and identified during job safety briefings. <br /> YES A First Aid Kit will be available at the job-site. <br /> Latitude/longitude coordinates of job-site(optional) <br /> Written directions to job-site <br /> Proceed north on Diamond St.to its end at E.Worth St.Proceed north into railyard across first set of tracks.Tum left <br /> proceed 150 feet to works site. <br /> Note: May be necessary to assign an employee to meet emergency response personnel at an intersection <br /> VI. FIRE PREVENTION <br /> Hot Work activities will be performed on BNSF property?: Yes NO No <br /> The below statements must be checked and implemented within you safety plan;by checking these statements you <br /> affirm that they will be accomplished.This Safety Action Plan will not be accepted unless these are checked. <br /> YES Risk Assessment activities and Job Safety Briefings will identify procedures/strategies,and equipment available for <br /> fire prevention and suppression,as well as,locations where suppression equipment will be staged. <br /> YES In Right-of-Way areas,the local fire agency is contacted to check possible hot work bans or restrictions,and to <br /> determine ability of local agency to provide emergency assistance. <br /> YES In Right-of-Way areas,the BNSF Engineering Right-of-Way Fire Prevention Risk Assessment form will be <br /> completed and maintained on the job-site. <br /> yes All right-of-way fires are to be reported to the responsible BNSF Project Representative. <br /> List fire prevention and suppression equipment on-site. <br /> Fire extinguisher <br /> VII. SAFETY AUDITING <br /> Formal safety audits of on-site work activities will be conducted at the following frequency e.g.twice/week,weekly: 1 <br /> per project <br /> http://www.railroadcourses.com/bnsf/safety/safetyplanconfirmation.asp 3/5/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.