Laserfiche WebLink
(VYATC <br /> • <br /> A S a O C i A T E 'a i N C <br /> filtered and analyzed for total and hexavalent chronuum, alkahnity, ammonium/ammonia, arsenic, total <br /> organic carbon, copper, dissolved and total iron, dissolved and total manganese, methane, nitrate, dissolved <br /> oxygen, oxidation-reduction potential, pH, sulfate, and zinc It should be noted that analyses of the slurry <br /> leachate for total metals in the water phase will be of little value since the water phase will have some <br /> soil particulates in it resulting from the mixed slurry For the ferrous iron test, the amount of reducing <br /> agent remaining will be the amount of ferrous iron (as opposed to total dissolved iron) For Cascade, <br /> absorbance will be measured - Cascade`s is yellow and typically converts to elemental sulfur that tends <br /> to precipitate onto glassware and suck there The conditions of each test are summarized in Table 1 <br /> Unfiltered treated samples of the "groundwater-only" matrices will be analyzed for Total Filterable <br /> Solids (total suspended and settleable solids) as a qualitative measure of the aquifer plugging potential <br /> of the two treatment methods <br /> Table 1. Dose Requirement Test Conditions. <br /> Test Matrix Amount FeII Amount Cascade <br /> 1 Control A GW None None <br /> 2 Control B GW+soil None None <br /> 3 GW 1 5X Stoich dose None <br /> 4 GW 3X Stoich dose None <br /> 5 GW+soil 1 5X Stoich dose None <br /> 6 GW+soil 3X Stoich dose None <br /> i7 GW None 1 5X Stoich dose <br /> 8 GW None 3X Stoich dose <br /> 9 GW+soil None 1 5X Stoich dose <br /> 10 GW+soil None 3X Stoich dose <br /> An additional control using site soil and groundwater not impacted by CrVl will be conducted to <br /> evaluate the amount of reducing agent consumed by non-impacted soil and groundwater This control <br /> will be conducted by creating a series of replicates containing soil and reductant and groundwater and <br /> reductant, then measuring reductant over time Dissolved iron will be measured for ferrous iron, and <br /> absorbance will be measured for Cascade® This procedure will give an indication of how long each <br /> reductant will persist, as much of the loss of reductant is expected to be due to decomposition <br /> (Cascade) or precipitation as pH increase (Fe) rather than reaction of the reductant with something in <br /> soil <br /> The non CrVI impacted soil sample will be obtained by advancing a soil boring in the northern porton <br /> of the site in the vicinity of MW-7 and beyond the known extent of CrVI impacted soil A soil sample <br /> will be collected from a depth anticipated to be from between 15 to 37 feet This boring will be <br /> advance following completion of the angle borings below Vault 8 so as to insure by visual observation, <br /> that the non CrVI impacted soil sample is of the same soil type as those collected from below Vault 8 <br /> The non CrVI impacted groundwater sample will be collected from the facility well (if the well has not <br /> been destroyed) or from monitoring well MW-1 Sample volumes of soil and groundwater will be <br /> based on laboratory requirements <br /> I <br /> I <br /> slenvironmentaM25831reportslRevtsedWKP-Bench test doe 6 <br /> i <br />