Laserfiche WebLink
Weiss ASSOCIATES <br /> 4 SCHEDULE <br /> ' We will begin the soil boring and well installation phase of the investigation three weeks <br /> after approval of the work plan by the San Joaquin Local Health District The initial draft <br /> report of the investigation results will be submitted three weeks after completion of the field <br /> ' investigation and receipt of soil and ground water analytic results <br /> 1 <br /> } <br /> D \ALL\331DWG\331P1SE0 WP Page 23 <br />