Laserfiche WebLink
0 <br /> Mr.M. Scott Mansholt—CEMC <br /> Soil Sampling Work Plan August 1,2006 <br /> Surland Homes Property Page 6 of 8 <br /> ' tape and plastic end caps, labeled with identifying information, and stored in a pre-chilled cooler <br /> for transportation to the laboratory. For the acetate liners,the selected soil sampling interval will <br /> be cut from the plastic liners prior to preservation. Soil samples will be recorded onto a chain-of- <br /> custody document that will accompany the samples to the laboratory and will designate the <br /> samples to be analyzed. <br /> ' Each borehole will be logged for lithological content using the Unified Soil Classification System <br /> guidelines,and for color,relative moisture content, and other observable distinguishing <br /> characteristics (i.e.,color changes, debris,rootlets, or odor). <br /> INVESTIGATION-DERIVED WASTE <br /> During the investigation, soil cuttings will be generated, and will be containerized within a <br /> Department of Transportation(DOT)approved drum. Water will also be generated during <br /> ' equipment decontamination, and will be stored in a separate DOT-approved drum. The <br /> investigation derived waste will be profiled for disposal and hauled to a CEMC disposal facility <br /> under the appropriate manifest/bill of lading. <br /> ' PROPOSED ANALYSES <br /> SOIL SAMPLE ANALYSES <br /> ' Based on the soil sampling program developed above, selected soil samples will be analyzed by a <br /> California State-certified laboratory for the petroleum hydrocarbon constituents listed below. All <br /> ' other soil sample collected will be placed on hold with the analytical laboratory. <br /> • TPH quantified as crude oil by EPA 8015M, <br /> • benzene, toluene, ethylbenzene, and total xylenes by 8260B,and <br /> ' • PAHs by EPA Method 8270,using Selective Ion Monitoring(SIM). <br /> ' QUALITY ASSURANCE/QUALITY CONTROL <br /> All field and laboratory procedures will be conducted in accordance with SAIC's Quality <br /> Assurance& Quality Control Sample Collection, Handling, and Analysis Guidelines. <br /> ' REPORTING AND SCHEDULE <br /> A Summary Report will be prepared to document the results of the soil sampling and analyses. <br /> ' This report will include soil analytical results, certified analytical reports and chain-of-custody <br /> documentation, field data sheets, and description of field methods used to obtain the samples. <br /> The report will include tables and figures presenting soil analytical data. In addition, a HHSE <br /> ' will be developed. The nature and methodology used in developing the HHSE will be presented <br /> to the DTSC in advance of developing the HHSE. <br /> ' SCHEDULE <br /> SAIC is prepared to initiate the proposed work scope within 4 weeks on approval of this work <br /> plan. A Summary Report will be submitted within 60 days after the completion of the field <br /> ' investigation and receipt of the laboratory analytical data. <br />