My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DOUGLAS
>
1807
>
3500 - Local Oversight Program
>
PR0544622
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 3:59:31 PM
Creation date
7/3/2019 1:43:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544622
PE
3528
FACILITY_ID
FA0003905
FACILITY_NAME
PAIGES TOWING
STREET_NUMBER
1807
STREET_NAME
DOUGLAS
STREET_TYPE
RD
City
STOCKTON
Zip
95207
APN
09721019
CURRENT_STATUS
02
SITE_LOCATION
1807 DOUGLAS RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Water Resources Contro?Board <br /> Division of Clean Water Programs z. „..,. <br /> Winston H. Hickox 2014 T Street•Sacramento,California 95914•(916)227.4411 <br /> Mailing Address: P.O.Box 944212•Sacramento,California•94244-2120.. Gray Davis <br /> secrelutm fur FAX(916)227-4530•Intemet Address: het //www,swrcb.ca.Dov/--cw home/�zstcl <br /> Environmentd( p' � P Governor <br /> Aroteclion <br /> S ir, t <br /> o18 -ju;ay � � ; : . <br /> l <br /> William E. Watkins ti <br /> 1807 Douglas Rd <br /> Stockton, CA 95207 <br /> UNDERGROUND STORAGE TANK CLEANUP FUND PROGRAM;NOTICE OF ELIGIBLLITY_`�t: <br /> DETERMINATION: CLAIM NUMBER 014176; FOR SITE ADDRESS: 1807 DOUGLAS RIS, <br /> STOCKTON,. ., <br /> Your claim has been accepted for placement on the Priority List in Priority Class "B with a deductible <br /> of$5,000. ; <br /> We have completed our°initial review. The next step in the claim review process is to conduct a <br /> compliance review. I - <br /> Compliance Review: Staff reviews, verifies, and processes claims based on the priority and rank within <br /> a priority class. After the Board adopts the Priority List, your claim will remain on the Priority List until <br /> your Priority Class and rank are reached. At that-time, staff will conduct an extensive Compliance'• <br /> Review at the local regulatory agency or Regional Water Quality Control Board. During this Com}iliance <br /> Review, staff may request additional information needed to,verify eligibility. Once the Compliance ' <br /> Review is completed, staff will determine if the claim is valid or.must be rejected. If the claim is valid, a <br /> Letter of Commitmentwill be issued obligating funds toward the cleanup. If staff determine that you <br /> have not complied with regulations governing site clean-up, you have not supplied necessary information <br /> or documentation; or your claim application containss-a material error,,the claim will be rejected. In such <br /> event, you will be issued a Notice of Intended Removal from the Priority List, informed of the basis'for F <br /> the proposed removal of your claim, and provided an opportunity to correct the condition that is the basis <br /> for the proposed removal. Your claim will be barred from further participation in the Fund, if the claim <br /> application contains a material error resulting from fraud or intentional or negligent misrepresentation. <br /> Record-keeping:`During your'cleanup-pro�ect-you should keep complete and well organized records of all' M <br /> corrective action activity and payment transactions. If you are eventually issued a Letter of Commitment, <br /> you will be required to submit: (1)copies of detailed invoices for all corrective action activity performed <br /> (including subcontractor invoices), (2) copies of canceled checks used to pay for work shown on the i <br /> invoices, (3) copies of technical documents (bids,narrative work description,reports), and(4)evidence <br /> that the claimant paid for the work performed(not paid by another party). These documents are necessary <br /> for reimbursement and failure to submit them could impact the amount of reimbursement made by the <br /> Fund. It is not necessar"yto submit these documents at this time; however, they will definitely be <br /> required prior to reimbursement. " , w '^;; ,�''", ' <br /> Corimi)liance'with'Correctivd'Actioii Requirements:-lriord'e'r to'be'reimbursed for'ybdr- eligible`casts of <br /> cleanup incurred after Deceirlber 2,'1991,you�must have complied with corre'five actio n`requiremenfs'`of <br /> Article 11, Chapter 16, Division 3, Title 23, California Code of Regulations. 'Article l 1 categorized the <br /> corrective action process'into pleases. In addition, Article I 1 requires the responsible party to submit an <br /> j <br /> California En v,ronmenta/Protection Agency <br /> .ro <br /> �a Recyc%dF per <br />
The URL can be used to link to this page
Your browser does not support the video tag.