My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3632
>
2900 - Site Mitigation Program
>
PR0508065
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 4:17:01 PM
Creation date
7/3/2019 2:18:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508065
PE
2950
FACILITY_ID
FA0007918
FACILITY_NAME
WILKINSON EQUIP/CLEMENTINA
STREET_NUMBER
3632
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
952157952
CURRENT_STATUS
01
SITE_LOCATION
3632 DUCK CREEK DR B
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL PERFORMANCE, INC. PAYMENT <br /> A Strategic Environmental Management Company R EC"71V'E, r' <br /> ,JUL 0 81998 <br /> SAN JO;,,JUIN OOUNYr <br /> PUBLIC K RUTH 9ERVICES <br /> July 7, 1998 ENVIRONMENTAL HEALTH DIVISION <br /> Ms. Margaret Lagorio <br /> San Joaquin County PHS-EHD <br /> 304 E. Weber Street, Third Floor <br /> Stockton, CA 95202 <br /> Dear Margaret: <br /> Enclosed please find a copy of the MFR, application for well permit, a site map, and a <br /> check for the permit fee. We sincerely appreciate your help in expediting the perimit <br /> process as we are on a tight time constraint. <br /> We will be conducting two soil borings down to a maximum depth of twenty feet. We will <br /> monitor the borings and in the event groundwater is encountered within twenty feet, we will <br /> grab a water sample before closing the borings. According to our driller, West Hazmat <br /> Drilling, we are scheduled to be on site on Friday, July 17, 1998. <br /> Once again, thanks for your assistance in permitting process. <br /> Sincerely, <br /> Sach Prasad <br /> President <br /> 2202 Timberloch Place,Suite 250 O The Woodlands,Texas 77380 <br /> Phone:(713)362-8377 O Fax:(713)362-8381 O E-Mail:epi®phoenix.net <br /> aaI <br />
The URL can be used to link to this page
Your browser does not support the video tag.