My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2900 - Site Mitigation Program
>
PR0522088
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 4:51:10 PM
Creation date
7/3/2019 2:55:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0522088
PE
2950
FACILITY_ID
FA0015050
FACILITY_NAME
RYDER TRUCK RENTAL
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' FIELD PROCEDURES <br /> CA BORING AND SOIL SAMPLE COLLECTION <br /> ' 1. Borings will be drilled with a limited access truck-mounted drilling rig equipped with nominal <br /> 8-inch outside diameter hollow stem augers. <br /> ' 2. The augers will be cleaned prior to use in each boring. <br /> ' 3. Soil descriptions, sample type and depth, and related drilling information will be recorded on <br /> a boring log and reviewed by a State of California Registered Engineering Geologist from <br /> ' FREY Environmental. <br /> 4. Soil samples will be collected using a split spoon sampler. <br /> ' S. The sampler will be cleaned between sample intervals using a brush and tap water followed by <br /> a brush and TSP solution, a tap water rinse, and deionized water rinse. The sampler will be <br /> ' dried by air or with a paper towel prior to sampling. <br /> 6. Soil samples will be collected in 2-inch inside diameter and 6-inch long brass or stainless steel <br /> ' tubes. Three six-inch tubes are generally enclosed in the sampler. Prior to initial use, the <br /> sample tubes will be cleaned, rinsed, and dried using the procedures described above. <br /> ' 7. The sampler will be driven into the soil using standard penetration test procedures. <br /> 8. Following retrieval of the sampler, one of the two lower 6-inch tubes within the sampler will <br /> ' be removed from the sampler,and given sample recovery,the ends covered with aluminum foil <br /> and capped with plastic end caps.Each sample will be labeled with the sample number,sample <br /> depth, date,and project number. <br /> ' 9. The soil in the remaining sample tubes will be used to describe the soil in accordance with the <br /> ' Unified Soil Classification System. <br /> 10. The collected samples will be placed in plastic bags and stored on ice. <br /> ' 11. The samples will be delivered to the laboratory following collection. Sample handling, <br /> transport, and delivery to the laboratory will be documented using Chain-of-Custody <br /> ' procedures, including the use of Chain-of-Custody forms. <br />
The URL can be used to link to this page
Your browser does not support the video tag.