Laserfiche WebLink
CH2M HILL <br /> 155 Grand Avenue <br /> Suite 1000 <br /> Oakland,CA <br /> CH2MHILL 9,4612 <br /> P.O.Box 12681 <br /> Oakland, CA <br /> November 26,2001 rl \f 2 Q Z Q Q) 94604-2661 <br /> Tel 510.251.2426 <br /> Attention: Mr.Jeffery Wong CI. Fax 510.693.8205 <br /> San Joaquin County <br /> Public Health Services- <br /> Environmental Health Division(PHS-EHD), <br /> 304 East Weber Avenue,3rd Floor, <br /> Stockton,California 95202 <br /> Subject: Environmental Sampling Permit for One (1) Pacific Gas &Electric <br /> Company Gas Gathering Station Located within San Joaquin County <br /> Dear Mr.Wong, <br /> The purpose of this letter is to provide the work plan and drilling time and date for the <br /> above work. <br /> Representatives of CH2M HILL have previously been in contact with you to initiate the <br /> permit application process. As the project hydrogeologist,I will be organizing and <br /> conducting the drilling program,and wish to help you coordinate your site inspections. A <br /> brief outline of the project follows. <br /> CH2M HILL has been commissioned by the Pacific Gas and Electric Company(PG&E) to <br /> conduct environmental sampling at 14 gas gathering stations located within seven Counties <br /> in the Central Valley,California. These stations are part of PG&E's California Gas <br /> Transmission System. The Central Valley Regional Water Quality Control Board <br /> (CVRWQCB)has instructed PG&E to conduct this work and is the regulatory oversight <br /> authority for the project. The Vernalis Dehydrator Station is located within Tehama County. <br /> Because the sampling depths for this program are relatively shallow,a hand auger will be <br /> used to collect all samples. The sampling will be performed by CH2M HILL staff. <br /> Therefore,a drilling contractor and drill rig will not be used. <br /> The planned drilling date is from approximately 9:00am to 1:00pm,Monday,December 10th, <br /> 2001. This date may change due to inclement weather or other unforeseen factors. I will <br /> inform you of the final sampling date with as much advance notice as possible. <br /> Driving directions to the site is included with this package. A summary of the proposed <br /> sampling and permit fee calculations are shown in Table 1. Sampling locations are shown <br /> on the accompanying site work plan(Figure 1). <br /> I understand that the fee for the boring permit is$89. A check for this amount is included. <br /> Should you have any questions my contact details follow: <br />