My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
1600
>
3500 - Local Oversight Program
>
PR0544624
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 5:48:15 PM
Creation date
7/3/2019 3:27:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544624
PE
3526
FACILITY_ID
FA0005206
FACILITY_NAME
GEORGES SERVICE
STREET_NUMBER
1600
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25510004
CURRENT_STATUS
02
SITE_LOCATION
1600 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR-07-0000 04:2G FROM GEOLOGICAL TECHNICS TO 4640130 P.05 <br /> Work7rc(mics'1»G • � Paget <br /> an Addendum <br /> Project No.425.2 <br /> January 24, 1997 <br /> 2. Milton Birkhahn- 1697 West Durham Ferry Road <br /> 3. Muriel Jones- 31448 South Hwy. 33 <br /> 2.2 Monitoring Well Installation <br /> To further investigate the lateral and vertical extent of gasoline and kerosene range petroleum <br /> hydrocarbons in the soil and groundwater environments_ Geological Technics Inc, proposes <br /> to install five additional shallow groundwater monitoring wells surrounding the known <br /> plume area and one discretely screened deeper monitoring well (Figure 2 Site Mapy <br /> Based on the seven months of groundwater measurements and gradient calculation, the <br /> groundwater exhibits a predominately north direction of flow. <br /> • The five new shallow wells (MW-4, 5, 6, 7 & 8) will be placed in a manner that will <br /> provide upgradient,perpendicular to gradient,and down gradient definitions of the lateral <br /> extent of groundwater contamination. <br /> • The one new deeper well (MW-101)will be placed down gradient of the source near well <br /> MW-2. <br /> Refer to the attached site map for proposed well Iocations. <br /> 3.0 SIGNATURE AND CERTMCA'nON <br /> It is expected that this project be performed in accordance with accepted geologic and <br /> hydrologic standards of the State of California accepted and in effect at the time of this <br /> investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This work plan was prepared by: <br /> Geo14# aL'I=hnirs Inc. <br /> moi✓ �-bf"L'vv1 <br /> Michael J.Niemi <br /> Geologist <br /> Raynold I.Iiablanow Il, Ph.D. <br /> California Registered Geologist 95234 <br /> Registered Environmental Assessor#901 <br />
The URL can be used to link to this page
Your browser does not support the video tag.