My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
1600
>
3500 - Local Oversight Program
>
PR0544624
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 5:48:15 PM
Creation date
7/3/2019 3:27:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544624
PE
3526
FACILITY_ID
FA0005206
FACILITY_NAME
GEORGES SERVICE
STREET_NUMBER
1600
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25510004
CURRENT_STATUS
02
SITE_LOCATION
1600 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. I <br /> Georges Service <br /> Page 3 of 3 <br /> 11. Submit an accurate scaled map showing the borders:'of the proposed excavation taking into account the <br /> exact location of the fiber-optic line that the Work Plan states exists underground at the site. If the <br /> location of underground utilities at the site impede the projected amounts of contaminated soil from <br /> being removed and prevent post-treatment goals for contaminant source reduction from being met,a <br /> pilot test for AS/SVE must be conducted. <br /> 12. Soil confirmation samples must be collected midway through the one-year attenuation time period to <br /> monitor attenuation progress and again at the one-year mark following the end of the attenuation <br /> monitoring period. If soil sample analysis does not confirm attenuation, conduct a pilot test and <br /> employ AS/SVE. <br /> 13. In the event that any residential drinking water well evidences contaminant levels which exceed the <br /> maximum allowable contaminant levels during the attenuation monitoring period you must notify the <br /> 1 <br /> property owner of the well(s) and provide potable drinking water. Remedial a tematives must be <br /> r <br /> evaluated if any drinking water well becomes impacted with contaminants and a more aggressive <br /> remedial method must be employed at the site within 90 days. A contingency plan outlining <br /> procedures to be taken should residential drinking water wells be contaminated must be submitted to <br /> PHSIEHD prior to beginning the source reduction work. <br /> 14. Because of the close proximity of potential receptors at this site and due to the approach of the rainy <br /> season, which could further delay remedial work,the excavation work must be completed no later than <br /> December 15,2000. <br /> The sooner the above adequate and necessary elements are provided to PHSIEHD for the Work Plan the <br /> sooner corrective action can occur at this site and public health and safety protected. Submit the <br /> I <br /> information to PHS/EHD no later than October 1 2000. Contact Carol Oz, Senior REHS at(209)468- <br /> 3440 if you have questions regarding this letter. Soil removal may not remediate the groundwater <br /> contamination. If groundwater contamination is not attenuating, groundwater remedial alternatives must be <br /> evaluated. <br /> Donna Heran,Director <br /> Environmental Health Division <br /> J v d <br /> Carol Oz, Senior REHS <br /> &*trorr4RG <br /> Site Mitigation Unit IV Engineering Geologist Unit IV <br /> cc: Marty Hartzell-CVRWQCB <br />'r Ray Kablanow-Geological Technics <br /> Wennilyn Fua-Cleanup Fund <br />� s <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.