Laserfiche WebLink
cim6gicalTecknicsIna • • Page 3 <br /> Work Plan <br /> George's Service <br /> Project No.425.2 <br /> August 16,2004 <br /> 5.0 BENCH SCALE TEST STUDY REPORT <br /> Geological Technics Inc. will prepare and submit the bench scale study report within 3 weeks <br /> after receiving the laboratory analysis from the lab. The report will include the findings from <br /> the bench scale study and recommendations for pilot testing, and other necessary information. <br /> Dr. Ray Kablanow, a registered geologist, will supervise this project. Copies of the report <br /> will be forwarded to both the appropriate County and State regulatory agencies (SCDER and <br /> CVRWQCB). <br /> 6.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Technics Inc. in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This work plan was prepared by: <br /> Mandeep Singh <br /> Project Engineer <br /> T?j e L= 7 — <br /> Raynold I. Kablanow H, Ph.D. <br /> California Registered Geologist#5234 <br /> Certified Hydrogeologist#442 <br />