Laserfiche WebLink
1 � � <br /> GaologfcalTeclu�icslnc Page 7 <br /> 1 Work Plan <br /> George's Service <br /> Project No.425.2 <br /> August 14,2002 <br /> 1 plume and down gradient of the plume. The 100-series wells and MW-201 will indicate <br /> what is occurring below the plume. <br /> 1 3.0 SCHEDULE&REPORTING <br /> 1 Geological Technics Inc. anticipates beginning fieldwork no later than 30 days after work <br /> plan approval, issuance of the drilling permit, and approval of the cost for this work by the <br /> USTCFP. <br /> 1 The information gathered during this phase of work will be presented in a report. Dr. Ray <br /> Kablanow, a registered geologist, will supervise this project. Copies of the report will be <br /> 1 forwarded to both the appropriate County and State regulatory agencies (SCDER and <br /> CRWQCB). <br /> 1 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Technics Inc. in accordance with accepted <br /> 1 geologic and hydrologic standards of the State of California accepted and in effect at the <br /> time of this investigation. Geological Technics Inc. is not responsible for undisclosed <br /> conditions. <br /> 1 This work plan was prepared by: <br /> 1 <br /> 1 Michael J. Niemi <br /> Geologist �ESS10 <br /> 10 QQ <br /> o <br /> No <br /> 5734 ~ <br /> Ra old I. Kablanow II, Ph.D. <br /> California Registered Geologist#5234 <br /> 1 Certified Hydrogeologist#442 SOF CA> <br /> i <br /> 1 <br /> 1 <br />