Laserfiche WebLink
' • • <br /> Geologicaf7uhnics Inc. Page 6 <br /> Feasibility Study Work Plan <br /> ' Project No.425.2 <br /> August 17,2000 <br /> ' 5.0 ADDITIONAL SITE CHARACTERIZATION <br /> ' 5.1 Quarterly Groundwater Monitoring <br /> In addition to TPH-G and BTEX, future groundwater monitoring will include the testing for <br /> ' the following compounds by method 8260: <br /> • Ethers (MTBE, TAME,DIPE, &ETBE) <br /> • TBA <br /> ' • 1,2-DCA <br /> • EDB <br /> • Methanol <br /> • Ethanol <br /> ' 5.2 Domestic Well Survey <br /> A receptor well survey report was submitted to SJC PHS/EHD on July 29, 2000. <br /> ' 5.3 Groundwater Gradient Rose Diagram <br /> ' Per the directive from SJC PHS/EHD, a Rose Diagram for historic groundwater gradients <br /> will be submitted with the third quarter groundwater monitoring report, pending approval <br /> from the USTCFP. <br /> 1 <br /> 1 <br />