Laserfiche WebLink
George's Service <br /> Remedial Action Work Plan <br /> Project No.425.2 <br /> June 30,2011 <br /> the sparge wells, and will be successful in addressing contamination in the western portion of <br /> the site. <br /> The third air sparging well AS-3 is proposed to be located south of the existing pump island, <br /> and is expected to assist with addressing soil contamination that is south of the excavation <br /> area. <br /> 6.1.1. Air Sparging Operation a1tY <br /> It is proposed to operate the o e sparging system for a period of twelve (12) months. The <br /> data will be reviewed at the end of this period and report of remedial effectiveness and <br /> further recommendations as appropriate will be prepared. <br /> 6.1.2. Air Sparging Wells <br /> Air sparging (AS) wells containing gas diffusers are needed to inject air into the subsurface. <br /> GTI proposes installing three (3) AS wells around the former service station as shown in the <br /> Remedial Improvement Plans. All AS wells will be installed into the sand unit that forms <br /> Zone A and a diffusion point will be installed to target the sand layer that extends to the north <br /> at about 22 ft bgs. <br /> The air sparging and VETS (as discussed below) will run in alternating pulses so extraction <br /> wells do not immediately remove the injected air. <br /> 6.1.3. Well Borehole Installation <br /> The air sparge (AS) well boreholes will be drilled by a licensed driller, using an 8-inch <br /> outside diameter, continuous flight, hollow stem auger. The AS wells will be constructed <br /> using 1.0 inch diameter PVC casing with flush threads. The sparge point will consist of a <br /> 24"long fine screened interval designed to produS�Ane bubbles vvMaximum surface area. <br /> A#12 sand filter pack will surround and extend,l�foWabove andt Ww the sparge point. A <br /> three-foot transition seal will be installed above the sand pack by adding weighted bentonite <br /> pellets. A surface seal will be achieved by pumping a neat cement grout (augmented with < <br /> 4% bentonite) via a tremie tube. The tops of the wells will be provided with a T- shaped <br /> joint. See Figure 8 for a schematic of AS well construction. _ <br /> 6.1.4. Soil Sampling <br /> Select soil samples will be collected in 6.0-inch brass liners using a 2.0-inch modified <br /> California split spoon sampler. All soil samples will be sealed with Teflon, capped with <br /> plastic end caps, labeled and placed in a cooler at 4° Celsius for transport to a California <br /> certified laboratory under Chain of Custody procedures. It is proposed that continuous <br /> coring be utilized to confirm the soil tithology. <br /> These soil samples will be analyzed for TPH-g& BTEX constituents by EPA method 8260B. n,{ <br /> cw�v" � <br /> Geological reckxics inc. 16 <br /> 4252 RAP.docx <br />