Laserfiche WebLink
CT"logecal recwcs 11K Page 4 <br /> George's Service <br /> Soil Excavation Report <br /> Project No 425 3 <br /> January 28, 2002 <br /> ' On October 30 and 31, 2001 Del-Tech Geotechnical Support Services (Del-Tech) and <br /> Fagundes & Son Inc personnel mobilized to the site to properly dispose of the stockpiled <br /> ' soil The soil was taken to Forward Incorporated, 9999 South Austin Road, Manteca, <br /> California, for disposal <br /> ❑ October 30, 2001 — Seventeen truckloads of soil totaling 287 39 Cubic Yards <br /> ❑ October 31, 2001 —Twelve truckloads of soil totaling 208 58 Cubic Yards <br /> ' A total of 495 97 Cubic Yards (541,064 Kg) of soil was removed from the site with an <br /> average TPH-gasoline of 4,114 mg/Kg This brings the amount of TPH-gasoline removed <br /> to approximately 4,897 pounds The weigh tags from Forward Landfill are included in <br /> Appendix C <br />' Mass Estimate Calculation <br /> A soil mass estimate calculation was prepared to determine the amount of soil <br /> contamination present prior to the excavation The calculations show that approximately <br /> 11,630 pounds (1,900 gallons) of gasoline was piesent in the soil <br /> ' The calculations were prepared as follows <br /> 1 The soil plume was defined by soil sample analysis from a combination of soil borings, <br />' hand auger borings and monitoring well borings <br /> 2 The soil plume was divided into two areas, Core & Ring 1, Figure 2 The Core <br /> encompasses the borings and excavation samples that held high concentrations of TPH- <br /> G Ring 1 encompasses the borings that held low concentrations of TPH-G <br /> 3 The Core is 660 ft in aerial extent and Ring 1 is 6,990 ft2 in aerial extent <br /> 4 The top of the soil plume in the Core was set at 3-feet bgs, based on soil analytical data <br /> and field observations The bottom of the soil plume in the Core was set at 15-feet bgs, <br /> based on analytical and field observations <br /> 5 The top of the soil plume in Ring I was set at 5-feet bgs, based on soil analytical data <br /> and field obseivations The bottom of the soil plume in Area 2 was set at 15-feet bgs, <br /> based on analytical data and field observations <br /> 1 6 The TPH-G concentrations for the soil samples taken within each area were averaged to <br /> give an overall concentration for the area Excavation sidewall sample analysis, in <br /> addition to soil boring analysis, were used in determining the contaminate load in each <br /> ' area <br /> 7 The soil type was denoted as silty, it ranges from silty sand to silty clay <br /> 4.0 CONCLUSIONS AND RECOMMENDATIONS <br /> Conclusions <br /> ' 1 A total of 595 17 tons of contaminated soil including nearly 4,900 pounds of TPH- <br /> gasoline was removed from the site <br /> 2 All of the contamination in the subsurface was not removed, as evidenced by the <br />' sidewall sample analysis, however total removal was not the goal of this project The <br /> goal of removing the heart of the soil plume was met <br /> 3 An estimated 42% of the total mass of contaminants was removed by this excavation <br />' work The balance is found in the sidewalls of the excavation and below groundwater in <br /> the bottom of the excavation <br />