Laserfiche WebLink
F4 <br /> DEL.,-TECH GEOTECHNICAL SUPPORT SERVICES <br /> ' MONITORING WELL FIELD LOG 2000 <br /> ' SAMPLE LOCATION/MW- 05 DATE: 6120100 <br /> PROJECT NAME GEORGE' S SERVICE ANALYSIS PERFORMED, SEE CHAIN OF CUSTODY <br /> ADDRESS, 1600 DURHAM FERRY ROAD SAMPLE TIME 945 <br /> CITY,STATE TRACY,CA SAMPLE CONTAINERS 2 V O A's <br /> SITE CONTACT. GEORGE&MAE PRESERVATIVES HCL <br /> CONSULTANT: GEOLOGICAL TECHNICS LAB.ANALYSIS BY SHERWOOD LABS <br /> PROJECT MANAGER RAY KABLANOW MONUMENT FLUSH <br /> SAMPLER DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED, WELL CASING DIA 2" / 0 1632 <br /> SAMPLE MEDIA: GROUNDWATER P.LI? READING/ODOR. NIA NONE <br /> TOP OF CASING ELEVATION MSL COLOR CLEAR <br /> DEPTH TO WATER feet,I00th's) 945 FEET CALC PURGE VOL 3 876 GAL <br /> DEPTH DF WELL (feet 1QOth's) 3320 FEET TOTAL VOLUME PURGED 12 CTAL <br /> ' STANDING WATER COLUMN 2375 FEET DEPTH OF PUMP N/A FEET <br /> FIELD PARAMETERS <br /> TIME CUMULATIVE DRAW PUMPING PH E C TEMP O R.P DISSOLVED TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br /> ' PER PURGE (D T W) (GPMILP (units) (MsMBOS) (Celsius) (waits) (PPM) (N T U) <br /> 0 N/A 5 GPM 762 1514 23 1 -111 NIA CLEAR <br /> 4 P, 740 1515 213 -100 " <br /> 8 751 1506 212 -94 " <br /> 12 727 1511 209 -93 " <br /> PURGE METHOD HONDA CENTRIFUGAL PUMP <br /> SAMPLE METHOD 1'STAINLESS STEEL BAILER WITH STAINLESS STEEL WIRE LINE <br /> ' D T W AFTER PURGE D,T W AT SAMPLE TIME 27 86' <br /> WELL INTEGRITY CAP&SEAL ARE SECURE <br /> WELL LOCATION SEE SITE MAP <br /> REMARKS <br /> WEATHER CLEAR SKIES WIND <br /> QUALITY CONTROL ALL PURGING E UIPMFVT AND SAWLING E UIPAIENT WAS CLEANED IN THE <br /> FIELD WITH A STEAMCLEANER&ALCONOX SOAP NEW A7TRILE GLOPM <br /> CONTAINMENT D O T 17 55 GAL STER'L DRUM OR 60 GAL POLY DRUM <br /> INSTRUMENTATION Y S I 3560 FLOWCELL Y S I DISSOLVED OXYGEN METER <br /> SOLINIST SLOPE METER THERMODINE 580B P I D <br /> . KECK INTERFACE METER TURBIDITY METER <br />