Laserfiche WebLink
Geological Technics Inc Page 6 <br /> George's Service <br />' Additional Site Characterization Work Plan <br /> . Project No 2812 <br /> January 29,1996 <br />' Water using samples will be tested for BTEX EPA method 602, TPH-Gasoline EPA <br /> P g <br /> method 5030/8015(m) and TPH-Diesel using EPA method 3510/8015(m) -The <br />' detection limits for these compounds in water are listed above in Table 1 <br />' 2.6 Groundwater Monitoring <br /> The wells will be placed on a quarterly groundwater monitoring schedule. The first <br />' monitoring event will be performed shortly after this new well is installed. The local <br /> regulatory agency will be notified 48 hours prior to the sampling event <br /> 3.0 SCHEDULE & REPORTING <br /> It is expected that field work would commence no later than 60 days after work plan <br /> approval and upon issuance of the drilling permit The information gathered during <br /> this phase of work will be presented in a report which will include a summary of the <br />�. geology, the results of sample analyses, and professional conclusions and <br /> recommendations Copies of the report will be forwarded to both the appropriate <br /> County and State regulatory agencies (SJCPHSEHD and CRWQCB) <br /> y <br /> 1 <br /> 1 <br />