Laserfiche WebLink
Geological TCAMWs Inc Page 6 <br /> Groundwater Moautonng Report <br /> Project No 425 2 <br /> Apn] 18,2003 <br /> ' Recommendations <br /> The following recommendations are made <br /> ' 1 The current quarterly monitoring schedule should be maintained to determine <br /> contaminant trends <br /> ' 2 A work plan for additional soil and groundwater investigation was prepared and <br /> submitted to SJCEHD on August 20, 2002 The work plan was approved, with <br /> conditions, by Nuel C Henderson, Jr (SJCEHD) in a letter dated October 21, 2002 <br /> ' This work is scheduled to take place during the second quarter of 2003 <br /> 4.0 LIMITATIONS <br /> This report was prepared in accordance with the generally accepted standard of care and <br /> practice in effect at the time Services were rendered It should be recognized that <br /> definition and evaluation of environmental conditions is an inexact science and that the state <br /> or practice of environmental geology/hydrology is changing and evolving and that <br /> ' standards existing at the present time may change as knowledge increases and the state of <br /> the practice continues to improve Further, that differing subsurface soil characteristics <br /> can be experienced within a small distance and therefore cannot be known in an absolute <br /> sense All conclusions and recommendations are based on the available data and <br /> information. <br /> ' The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the law No warranty, expressed or implied, <br /> ' is made <br /> 1 <br />