Laserfiche WebLink
' Ocalag walT""Cs Inc Page 10 <br /> George's Service <br /> Feasibility Study <br /> Project No 425 2 <br /> April 28,2004 <br /> ' Our goal is to have this site under remediation by August 2004 and have the site closed by <br /> the end of 2005 If we can coordinate the remediation at George's Service with the <br /> ' remediation at Sinclair Trucking, APT will lower the weekly mobilization costs because of <br /> the proximity of the two sites <br /> ' �.0 SCHEDULE & REPORTING <br /> Geological Technics Inc anticipates beginning fieldwork no later than 30 days after work <br /> ' plan approval and cost pre-approval by the USTCFP The information gathered during this <br /> phase of work will be presented in a report, which will include a summary of the geology as <br /> well as the results of sample analyses Dr Ray Kablanow, a registered professional <br /> ' geologist, will supervise the project Copies of the report will be forwarded to the <br /> appropriate County and State regulatory agencies (SJC/PHS EHD and CRWQCB) <br /> ' 6 0 SIGNATURES & CERTIFICATION <br /> Geological Technics Inc will perform this project in accordance with accepted geologic and <br /> ' hydrologic standards of the State of California accepted and in effect at the time of this <br /> investigation Geological Technics Inc is not responsible for undisclosed conditions <br /> This feasibility study was prepared by <br /> ' Eric L Price <br /> Geologist FEssi <br /> Q191 <br /> R{ coo <br /> iCA,BIN'�11 r� <br /> No 5234 1r <br /> ' Raynold I Kablano II, Ph D * {• a �P <br /> R G #5234, CHG # 442 ST�TFoF CaL�Fp�? <br /> t <br />