Geologcca l hn lice Page 6 <br /> 7'ecccs <br /> George's Service <br /> Feasibility Study <br /> Project No 425 2 <br /> April 28,2004 <br /> The AOPs have been very successful at treating gasoline compounds and the gasoline <br /> oxygenated fuel compounds AOPs are promising because they quickly destroy the <br /> ' contaminant rather then augmenting the relatively slow biological processes at the site <br /> Typically, AOPs use one or more of the following to create the hydroxyl radical <br /> ' • Hydrogen peroxide <br /> • Ozone <br /> ' • Fenton's reagent <br /> Oxygen Releasing Compounds (ORCs) <br /> ' Oxygen Release Compound (ORC) has been shown to aid in the natural attenuation <br /> degradation of petroleum hydrocarbons in the soil and groundwater ORCs could be used at <br /> this site relatively quickly and the installation process would be relatively inexpensive <br /> ' ORCs are magnesium peroxide compounds that slowly releases oxygen once it is hydrated <br /> The byproducts of the reaction are oxygen and magnesium hydroxide The material <br /> continues to release oxygen in the subsurface for approximately 6 months after application <br /> The ORCs are installed using a GeoProbe direct push rig and a pressure pump A series of <br /> borings are pushed to a determined depth then a slurry of ORC is pumped through the drill <br /> rods under pressure as the rods are retrieved from the boring The borings are drilled in a <br /> grid pattern in the area of highest groundwater contamination <br /> The application and cost of ORC and an AOP are very similar, however the AOP has the <br /> 1 advantage because it is directly breaking down the contaminant where the ORC is only <br /> increasing oxygen to aid in bioremediation Bioremediation is a relatively slow process that <br /> can be dependent on site conditions other then dust oxygen levels <br /> 3.0 ASSOCIATED PROJECT COSTS <br /> ' 31 In Situ Chemical Treatment <br /> GTI has obtained estimates to perform in situ remediation at the site The following <br /> estimates are based on similar work at other sites A three bidding process will be used to <br /> ' determine actual costs upon approval of a Corrective Action Plan <br /> Description Estimated Costs <br /> Project Planning & Coordination $ 7,000 <br /> Install Injection Wells (install and modify0 arious depth wells) 30,000 <br /> In Situ Oxidation Estimate (16 events) 95,000 <br /> Background Data Collection 2,000 <br /> ' Background Data (Gen Min, TOC, metals, alkalinity, COD, BOD, etc) 2,000 <br /> Field Work Supervision & Sampling - Infection Cycle (bi-weekly) 18,000 <br /> Analyses During Infection Cycle (GW analyses) 9,000 <br /> ' Project Management & Supervision 10,000 <br /> Data Evaluation & Reporting 10,000 <br /> Abandon Injection Wells 9,000 <br /> $192,000 <br /> 1 <br />