Laserfiche WebLink
4C0k9kal7'eckn a/a. Page 6 <br /> �— Additional Site Characterization <br /> And 151 Quarter 2004 Groundwater Monitoring <br /> Project No.425.2 <br /> March 22,2004 <br /> wells for approximately 5 minutes and purging the wells until the purged water was nearly <br /> clear. The technician noted that the wells exhibited good recharge. <br /> On November 5, 2003, Del-Tech personnel arrived on site and developed two newly <br /> installed groundwater-monitoring wells (MW-2X and MW-106). Development included <br /> +-• surging the wells for approximately 5 minutes and purging the wells until the purged water <br /> was nearly clear. The technician noted that the wells exhibited good recharge. <br /> All water removed from the monitoring well and not used as a sample was placed in a 55 <br /> gallon DOT approved container that is properly labeled and temporarily stored on-site. <br /> GPS Survey <br /> '— On December 11, 2002, Thompson-Hysell Engineers and GTI personnel mobilized to the <br /> site to survey the monitoring wells in accordance to AB2886. The land surveyor data is <br /> included as Appendix E. The survey data was converted to decimal degrees and the data <br /> has been submitted electronically to GeoTracker as required under A132886. The data was <br /> uploaded to GeoTracker on February 10, 2004, and the confirmation number for the XY <br /> data is 9996494889 and for the Z data is 9047413468. <br /> SoiI and Water Disposal <br /> On November 25, 2003, GTI and American Valley Oil Company arrived on site and <br /> removed 275 gallons of water stored in DOT approved poly drums. <br /> On January 3, 2004, Del-Tech personnel arrived on-site to supervise the removal of soil <br /> ...� cuttings stored in drums from the installation of the monitoring wells. <br /> 3.0 RESULTS OF INVESTIGATION <br /> +� Summary analytical data tables are included in Appendix A. Laboratory Data Sheets are <br /> included in Appendix B. Borehole logs are included in Appendix C and the Groundwater <br /> Monitoring Field Monitoring Summary Report is included in Appendix D. GPS data <br /> gathered from a licensed land surveyor is included as Appendix E. <br /> A vicinity map is attached as Figure 1 and a site map with line of section for a cross section <br /> view is included as Figure 2. The cross section view is attached as Figure 3. A <br /> groundwater contour map from data gathered on January 3, 2004 is included as Figure 4 <br /> and Figure 5 is a rose diagram showing historical groundwater bearing and slope. The <br /> analytical results and field observations are discussed below. <br /> 3.1 Analytical Results <br /> 'r SOIL <br /> In summary: <br /> Three soil samples were collected during the installation of MW-106 and five samples <br /> �. during the installation of MW-201. The soil samples were submitted for laboratory analyses <br /> with the following results: <br />