Laserfiche WebLink
Gta4kat r¢cknuslnc Page 2 <br /> Pre-Bench Test Rpt <br /> George's Service <br /> Project No 425 2 <br /> March 10,2005 <br /> In the letter dated June 28, 2004, Nuel C Henderson, Jr , R G , San Joaquin County <br /> ' Environmental Health Department (SJC/EHD) reviewed and accepted the proposed method <br /> of in situ oxidation remedial method in the Feasibility study dated 28 April 2004, and <br /> directed GTI to prepare and submit the work pian for Bench Scale Testing GTI prepared and <br /> ' submitted the Work Plan dated August 16, 2004 for Bench Scale Study to Mr Nuel <br /> Handerson of SJC/EHD and Mr James Barton of California Regional Water Quality Control <br /> Board — Central Valley Region (CRWQCB-CV) Mr James Barton on a telephone <br /> ' conversation (September 22, 2004) with GTI discussed the issue of pre-bench scale testing to <br /> determine to go to pilot testing by skipping the full Bench Scale Testing After the telephone <br /> conversation with Mar James Barton, GTI discussed this issue with Dr Angus McGrath of <br /> ' SECOR International Incorporated Dr Angus McGrath agreed to write the report based on <br /> his other similar studies of chemical oxidation from the groundwater and soil analysis from <br /> the anticipated target zones of chemical oxidation Mr James Barton directed GTI to write <br /> ' the Work Plan Addendum for Pre Bench Scale/Pilot Testing GTI prepared and submitted <br /> the Plan Addendum—Pre Bench Scale /Pilot Testing dated September 22, 2004 to SJC/EHD <br /> and CRWQCB-CV Mr James Barton approved the work plan in the letter correspondence <br /> ' dated October 4, 2004 with some conditions The purpose of this Pre Bench Scale Testing <br /> and study was to determine whether a full Bench Scale Testing is necessary prior to a Pilot <br /> Study <br /> GTI personnel and Gregg Drilling (sub contractor) collected water and soil samples on <br /> December 27, 2004 according to the work plan and the samples were submitted to <br /> ' Excelchem Environmental Labs The lab results of these water and soil samples were <br /> submitted to Dr Angus McGrath to write an evaluation report of metal analysis in lieu of <br /> bench scale study for chemical oxidation With the direction from Dr Angus (after the <br /> ' telephone conversation between Mr Jim Barton and Dr Angus) GTI collected water samples <br /> on February 08, 2005 from MW-1 (screen interval 5 feet to 20 feet bgs) and MW-101 (screen <br /> interval 32 5 feet to 35 feet bgs), and the results were submitted to Dr Angus McGrath Dr <br /> Angus McGrath presented the evaluation report dated March 9, 2005 which is attached in <br /> Appendix A <br /> 2.0 PURPOSE OF STUDY <br /> The purpose of bench scale study is to evaluate the effects of infecting ozone into the aquifer <br /> materials on the mobilization of metals into solution GTI conducted the Pre-Bench Scale <br /> Study with the directives from CRWQCB-CV to determine if the full Bench Scale Testing is <br /> ' necessary before going to the pilot testing <br /> 3.0 SAMPLING PROCEDURE <br /> The soil samples were taken from Bench Scale Sampling (BSS-1, BSS-2) locations as shown <br /> in Figure 2 Water and soil samples were taken according to the following scheme <br /> 1 <br />