Laserfiche WebLink
Geologi at r"A cia Inc. Page 7 <br /> Groundwater Monitoring Report <br /> Project No. 425.2 <br /> March 21, 2005 <br /> 2. Given the new interpretation of groundwater gradient for Zone B, we propose to hold off <br /> on installation of the proposed new well MW-108 until we determine that it would <br /> ' provide valued additional groundwater data. <br /> 3. Prepare an interim remedial action plan (in progress) and implement the plan in a timely <br /> manner. <br /> 5.0 LIMITATIONS <br /> This report was prepared in accordance with the generally accepted standard of care and <br /> practice in effect at the time Services were rendered. It should be recognized that definition <br /> ' and evaluation of environmental conditions is an inexact science and that the state or practice <br /> of environmental geology/hydrology is changing and evolving and that standards existing at <br /> the present time may change as knowledge increases and the state of the practice continues to <br /> improve. Further, that differing subsurface soil characteristics can be experienced within a <br /> small distance and therefore cannot be known in an absolute sense. All conclusions and <br /> recommendations are based on the available data and information. <br /> The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the law. No warranty, expressed or implied, is <br /> M made. <br /> ' 6.0 SIGNATURES AND CERTIFICATION <br /> ' This report was prepared by: <br /> Mandeep Singh �Oh�IAL <br /> Project Engineer �S <br /> g �k. O� <br /> O O <br /> ' <br /> CL- <br /> R.I. KABLA <br /> NOW II <br /> W0. 5234 0 <br /> Raynold I. Kablanow II, Ph.D. <br /> California Professional Geologist #5234 F CALF <br /> ' Certified Hydrogeologist #442 <br />