Laserfiche WebLink
Q0(e kA(T"h4i s Inc Page 7 <br /> $ g , <br /> Groundwater Monitoring Report <br /> Project No.425.2 <br /> October 19,2004 <br /> Recommendations <br /> ' The following recommendations are made: <br /> 1, Continue quarterly groundwater monitoring events. <br /> 2. The work plan and the plan addendum for pre bench/pilot scale testing has been <br /> ' approved. GTI is in the process of preparing a budget and scheduling the work. The <br /> results of this work will be incorporated into a work plan for additional Remedial Action <br /> Plan (RAP). <br /> ' 3. Given the new interpretation of groundwater gradient for Zone B, we propose to hold off <br /> on installation of the proposed new well MW--108 until we determine that it would <br /> provide valued additional groundwater data. <br /> 5.0 LINHTATIONS <br /> ' This report was prepared in accordance with the generally accepted standard of care and <br /> practice in effect at the time Services were rendered. It should be recognized that definition <br /> ' and evaluation of environmental conditions is an inexact science and that the state or practice <br /> of environmental geology/hydrology is changing and evolving and that standards existing at <br /> the present time may change as knowledge increases and the state of the practice continues to <br /> improve. Further, that differing subsurface soil characteristics can be experienced within a <br /> small distance and therefore cannot be known in an absolute sense. All conclusions and <br /> recommendations are based on the available data and information. <br /> The tasks proposed and completed during this project were reviewed and approved by the <br /> 1 local regulatory agency for compliance with the law. No warranty, expressed or implied, is <br /> made. <br /> 1 <br />