My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
4491
>
3500 - Local Oversight Program
>
PR0544625
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 8:12:28 PM
Creation date
7/3/2019 4:20:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544625
PE
3528
FACILITY_ID
FA0003113
FACILITY_NAME
ZAPIEN MARKET
STREET_NUMBER
4491
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25504003
CURRENT_STATUS
02
SITE_LOCATION
4491 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOY 01 195 11:51AH CLEARWATER GROLP <br /> LEARATE <br /> C R O U P, 1 N C. <br /> well yield, however, it seems inappropriate to have the entire test consist of a <br /> dual phase application. <br /> A contemplated schedule of activity is as follows: <br /> 1) Complete 24 hour pumping test (24 hours or until drawdown in observation <br /> wells stabilim, as described in first workplan). <br /> 2) Complete a 4-6 hour combined test immediately following completion of the <br /> groundwater extraction test. per,.'d�`` . •,�.e + mss} . <br /> 3) Complete 4-6 hour non-pumping vapor extraction test, as described in first <br /> workplan_ tNf-*t" Al-T p,,,�,,,,r� -19 w+t <br /> 4) Complete sparging test as planned. � se--"C <br /> The technical elements of the testing approaches will remain the same as described <br /> in the workplan and addenda. Due to scheduling considerations, we are <br /> contemplating the use of carbon for vapor treatment, as opposed to the IC Engine. <br /> We will make sure that any contemplated change in off-gas treatment is acceptable <br /> both to you and the APCD prior to committing to such a change.Rfl"' blows t. <br /> I recognize that such new information presents a challenge, especially in light of the <br /> time that has passed since you and I first discussed the work to be completed at this <br /> site. l remain committed to providing Mrs. Ruiz with the best test possible, and :felt <br /> it important to get this update to you so we could discuss the most effective way to <br /> bring this about. <br /> I will be traveling for the rest of the week, but will be able to phone you from the <br /> road to discuss. If there is a time or a day that works best for you, please give my <br /> direct line a call (570.337.8732) and leave me a voice mail. <br /> I look forward to speaking with you again soon, <br /> Very truly yours, <br /> CLEARWATER GROUP, INC. <br /> Lklus Niebanck, R. G. <br /> Operations Manager <br /> CC. Mrs. Stella Ruiz, Ruiz Grocery <br /> Ms. Brooke Birkie, Neumiller & Beardslee <br />
The URL can be used to link to this page
Your browser does not support the video tag.