Laserfiche WebLink
%mpg <br /> PQ PROT TUBE POWER <br /> TO ATM AND GAUGGE POWER SUPPLY <br /> �A: PANEL <br /> (2�VrAPOR PHASE ------ <br /> G-i A41nVATED <br /> CARBON CANISTERS <br /> r.-- <br /> ——— CotlITRO <br /> - PANEL <br /> ----------- <br /> IELD&2TRY <br /> I <br /> ArR/WATFR I i UNIT 14100 <br /> SEPARATOR <br /> TANK <br /> SSAL WATFS <br /> "IE��11 HM swrT Hw <br /> LEVEL swncH LEVEL <br /> UNTFU'T LEVEL FLOW <br /> CIROMMWAIER I <br /> Hl LEVEL" CONTCH TFOL S METER PG PG <br /> 0 0 <br /> SM <br /> DRVLV SwTcH TREATED <br /> LOLML— Q1=4DWATER <br /> V sWrrrH _j SY (GRAVITY <br /> TEMP <br /> UCYLM RING NEAT <br /> VACUUM PUMP EXCHAN43M PRODUCT OILWATEA PUMP SUMP BAG (2)LIQUID PHASE <br /> muLTt-PHASE EXTRACTOR TANK SEPARATOR SYSTEM FILTER HP-200 ACTIVATED <br /> (MPX­lM (OWS-15) (PSSHP-30) CARBON CANISTERS <br /> Figure 1. <br /> MTX Treatment Center Schematic <br /> t4TROLPANEL <br /> ie'-e-INSIDE 4'.0' <br /> BREAKER PANEL <br /> UUUU ( U —I I I ELECTRIC POWER <br /> L T CONNECTION <br /> I-FULL CONDUIT <br /> (2)G-1 (2)HP-200 0 COUPLING WELD <br /> CARGO .0 0 GFC4 FLUSH WITH <br /> 0 LIGHT OUTSIDEWALL <br /> G-1 <br /> GFC1 <br /> DOORS LIGHT 270 GAL T-T ABOVE <br /> X-1 0 OWS STORAGE TELEMETRY FLOOR <br /> is TANK <br /> --PHONELLNE <br /> M Pd .F v 0 HEATERCONNECTION <br /> THEPJAO&ST�AAT. BOX <br /> (r ABOVE <br /> 24j FILTER FLFLOOR <br /> FAN V/ <br /> LIGHT SWITCH <br /> PERSONNEL <br /> Z PLAN VIEW DOOR <br /> IZ LG x S'H PIPING ENTRANCE <br /> CENTERLINE ur ABOVE FLOOR <br /> MPX WATER IN-L-STEM FPT <br /> SEAL WATER IN-i jr STEEL FpT <br /> TREATED WATER OUT-Z'SIEEL STU afERNOO L-LIGHT <br /> T-THERMOSTAT SWITCH <br /> 03-MST AIR OUT-3'STEEL STUaff_RNO0 M-MPXONIOW SWITCH <br /> SEE INSTRUCTIONS p.PUMP SUMP SYSTEM OWOFFSWITCH <br /> F-ExHAusTFAN ONA)FPSWITCH <br /> Figure 2. <br /> MPX Treatment Center Layout <br /> 391 <br />