Laserfiche WebLink
CLEARWATER <br /> c i N C. <br /> IJ Enni roti nrenlal Se,,ires - <br /> i <br /> TABLE OF CONTENTS <br /> j <br /> 1.0 INTRODUCTION...........................................:.:................................l <br />"- 1.1 Site Background................................ ..........:.............1 <br /> 2.0 GROUNDWATER MONITORING.....:...:......:.°....:{...............................2 <br /> 2.1 Field Activities and Laboratory Methods:.....:..........................::..........2 <br /> I, <br /> 2.2 Groundwater Monitoring Results .:............:...':.'................................2 ; <br /> 2.3 Groundwater Monitoring Recommendations ........................3 <br /> 3.0 WORKPLAN FOR CONFIRMATION SOIL BORINGS..............................4 <br /> 3.1 Proposed Scope of Work—,.....................:... <br /> 3.2 Field Methods..................................... <br /> ....:'................................4 <br /> 3.3 Analytical Methods ....................... 5 <br /> 3.4 Reporting <br /> 4.0 CERTIFICATION."... 1......................:.........6 <br /> TABLES ; . <br /> i� <br /> Table 1: Well Construction Specifications is <br /> Table 2: Groundwater Elevations and Sample Analytical Results <br /> FIGURES. . <br /> Figure I: Site Location <br /> Figure 2: Site Pian i <br /> Figure 3: Groundwater Elevation Map- 11/2/99 <br /> Figure 4: Hydrocarbon Distribution and Benzene Isoconcentration Map- 1172/99 <br /> Figure 5: Proposed Confirmation Boring Locations " <br /> p jI <br /> Figure.6: Cross Section A-A'with Pre-Remediation,Distribution of Soil Contamination <br /> and Proposed Confirmation Borings <br /> - <br /> APPENDICES' <br /> Appendix A: Clearwater Field Protocols F <br /> Appendix B: Clearwater Gauge/Purge Calculations and Well Purging Data Sheets <br /> Appendix C: Laboratory Reports and Chain-of-Custody?Forms <br /> I; <br />