Laserfiche WebLink
CLEARWATER <br /> G 2 O U P., "I N C. <br /> �nvironmenfaf Stry iCeS <br /> condition noted in the Authority-to-Construct e,=t,, including monthly "influent" and "effluent" <br /> air sampling and reporting. Therefore, Clearwater're'quests that Authority-to-Construct N=3868-1- <br /> 0 permit be'converted to a Permit-to-Operate for referenced project. <br /> i31 <br /> If you have any questions regarding system operation, 'please feel free to 'call me or Mr. Henry <br /> Hurkmans. <br /> Sincerely, <br /> Clearwater Group, Inc. <br /> Brian Gwinn, R.G. <br /> Senior Geologist <br /> Attachments: Table 1 -Catalytic Oxidizer Operational Data <br /> Table 2 - Catalytic Oxidizer Air.Sample Results <br /> Figure 1 -Site Location Map <br /> Figure 1 -Site Plan <br /> Figure 2 - SVE Process-Flow Diagram <br /> Certified Analytical Reports <br /> cc: Mrs. Stella Ruiz, Ruiz Grocery ` <br /> �Ms. Laura Duncan, SJCPHS/EHD <br /> Mr. David Stavarek, CVRWQCB ' <br /> t <br /> f <br /> t <br /> October 1, 1998 <br /> Mr. Craig Mitchell, SJVUAPCD 3 <br />