My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
4491
>
3500 - Local Oversight Program
>
PR0544625
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 7:58:36 PM
Creation date
7/3/2019 4:30:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544625
PE
3528
FACILITY_ID
FA0003113
FACILITY_NAME
ZAPIEN MARKET
STREET_NUMBER
4491
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25504003
CURRENT_STATUS
02
SITE_LOCATION
4491 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E' <br /> Case Closure Summary Page <br /> �eaking Underground Fuel Storage Tank Pham <br /> III Release and Site Characterization Information (continued) <br /> Maximum Documented Contaminant Concentrations -- Before and After Cleanup <br /> Contaminant Soil (ppm) Water (ppm) Contaminant 1 Soil (ppm) Water (ppm) <br /> Before After Before After Before After Before After <br /> TPH(Gas) 28,000 240 150 .220 Xylene 1,400 28 270 .020 <br /> TPH(Diesel) NA NA NA NA Ethylbenzene 250 3.7 4.7 .003 <br /> Benzene 230 .01 9.4 .00055 Oil &Grease NA NA NA NA <br /> Toluene 1,200 3.1 23.0 K.05 Heavy Metals NA NA NA NA <br /> MTBE NA .0083 3.8 .15 <br /> Comments: SOIL BEFORE RESULTS FROM TANK PULL SAMPLES COLLECTED 2128189. SOIL AFTER RESULTS . <br /> FROM CONFIRMATION BORING SOIL SAMPLES COLLECTED 3110100. WATER BEFORE RESULTS FROM MW2 ON <br /> 8120/98. WATER AFTER RESULTS FOR TPH—G, BENZENE, TOLUENE, ETHYL-BENZENE FROM MW 1 ON 7124100 <br /> AND FOR XYLENE, MTBE FROM MW2 ON 7124100. <br /> IV. Closure <br /> Does completed corrective action protect existing beneficial uses per the Regional Board Basin Plan?YES <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin.Plan? YES <br /> Does corrective action protect public health for current land use? YES <br /> Site management requirements: NONE <br /> Should corrective action be reviewed if lartd use changes? YES <br /> Monitoring/Vapor wells decommissioned: NO Number Decommissioned: 0 Number retained: 14 <br /> List enforcement actions taken: NOR <br /> List enforcement actions rescinded: NONE <br /> V. Local Agency Representative Data <br /> Name: MARGARET LAGORIO, RENS Title: SUPERVISOR, SITE MITIGATION UNIT <br /> Signature:`-1'1' � - Date: j - -y <br /> VI. Central Valley Regional Water Quality Control Board (RB) Notification <br /> Date Submitted to RB: Response Date: <br /> RB Staff: MARTY HARTZELL Response: <br /> Title: ASSOCIATE ENGINEERING GEOLOGIST <br /> VII. Additional Comments, Data, etc. <br /> This document and the related CASE CLOSURE LETTER, Shall be retained by the lead agency as part of the official <br /> site file. <br />
The URL can be used to link to this page
Your browser does not support the video tag.