Laserfiche WebLink
i <br /> page 2, Chronology <br /> 4491 Durham Ferry Road <br /> 03/11/98 Wells connected to system manifold prior to start up of SVE system. <br /> 09/28/98 SVE system start up. See "Groundwater and Remediation System <br /> Operation Monitoring Report-Fourth Quarter 1998" dated 1127199. <br /> 09/30/00 SVE system shut down. <br /> 03/10/00 Confirmation soil borings. See report"Confirmation Soil Sampling, <br /> Groundwater Monitoring-First Quarter 2000, and Closure Request" <br /> dated 3127100. <br /> 08/03/00 Groundwater Monitoring Report- Third Quarter 2000. shows low levels of . <br /> contamination remain in two monitoring wells. Consultant states that site <br /> has been effectively remediated to the extent practicable and the residual. <br /> contaminants do not appear to pose a threat to any nearby receptors. <br /> 12/13/00 PHSIEHD concurs with consultants request for closure. Consultant <br /> requested to provide a survey of wells within 2000 feet radius of the site. <br /> I <br /> i <br /> I <br /> i <br /> i <br /> i <br />