Laserfiche WebLink
CLEARWATER <br /> G R O U' P, I N C. <br /> Environmental Services <br /> Trace concentrations of xylene isomers (i.e. 1.5 gg/L) were detected in the water sample collected from the <br /> domestic production wells located on-site. However, it should be noted that water from this well is not used as <br /> drinking water,and the xylene concentration detected this quarter is substantially less than the California MCL of <br /> 17µg/L. The domestic well will continued to monitored on a quarterly schedule. <br /> Groundwater monitoring data and analytical results are presented in Table 2,and laboratory analytical reports are <br /> attached in Appendix C. <br /> 4 <br /> 3.0 SOIL VAPOR EXTRACTION AND AIR SPARGE SYSTEM <br /> The SVEIAS system design includes seven wells plumbed for'.vapor extraction(VW-1 to VW-4,MW-1,MW-2, <br /> and RW-1), and two wells plumbed for air sparging(SW-1 and SW-2)(Figure 2). The remediation system was <br /> constructed in mid 1998 in accordance with Clearwater's Problem Assessment Report, Feasibility Stuily, and <br /> Remedial Action Plan dated February 21, 1996, Revised Remedial Action Plan dated November 12, 1996, and <br /> Constructions Specifications dated March 28, 1997. The system was tested on September 28, 1998 for initial <br /> compliance testing according to the SJVUAPCD ATC permit#N-3868-1-0(Appendix D). Mr. Craig Mitchell, <br /> I the SJVUAPCD representative, was present on-site to witness.verification testing. Results of the verification <br /> testing indicated that the system was operating within compliance of the permit, and the remediation system was <br /> r restated for full operation on October 7, 1998. Results of initial system testing were presented in Clearwater's <br /> letter report dated October 1, 1998. <br /> 3.1 Operational Data -- Soil Vapor Extraction and`Treatment <br /> Petroleum hydrocarbon vapors extracted from soil and groundwater are treated by a Solleco ECAT 250 all electric <br /> catalytic oxidizer(catox). <br /> In accordance with the SJVUAPCD PTO permit#N-3868-1-0(Appendix D),the influent and effluent air streams <br /> for the catox unit were analyzed for contaminant concentrations (TPHg and BTEX) on a monthly basis. Catox <br /> operational data and analytical results of influent and effluent samples are presented on Table 3, and the SVE/AS <br /> process flow diagram is shown on Figure 5. Cumulative analytical results of vapor samples collected from the <br /> catox influent and effluent streams are presented on Table 4..The following is a summary of the operational data <br /> y and analytical results of samples from the SVE process stream for this monitoring period: <br /> r - <br /> 5 <br /> D-107 1Q99 GW&Sys. Mon.Report 3 April 5. 1999 <br />