Laserfiche WebLink
San Joaquin Valley <br /> Unified Air Pollution Control District <br /> AUTHORITY TO CONSTRUCT <br /> PERAM NO: N-3868-1-0 ISSUANCE DATE: 07/17'/97 <br /> LEGAL OWNER OR OPERATOR: RUIz GROCERY STORE/CLEARWATER <br /> MAILING ADDRESS: 520 THIRD STREET SUITE 104 <br /> OAKLAND, CA 94607 <br /> LOCATION: 4491 W DURHAM FERRY ROAD,TRACY <br /> J <br /> EQUIPMENT DESCRIPTION: <br /> SOIL AND GROUNDWATER VAPOR EXTRACTION AND REMEDIATION OPERATION SERVED BY A 46 KVA STEALTH <br /> INDUSTRIES(MODEL BOBCAT 250) CATALYTIC OXIDIZER FOLLOWED BY TWO(2)WESTATES (MODEL VSC-2000) <br /> 2,000 POUND CARSON CANISTERS. <br /> CONDITIONS', <br /> 1. No air contaminant shall be discharged into the atmosphere fora period or periods aggregating more than <br /> three minutes in any one hour which is dark or darker than Ringelmann 1 or equivalent to 204 opacity. <br /> 2. No air contaminant shall be released into the atmosphere which. causes a public nuisance. <br /> 3. The remediation project shall be maintained in proper operating condition at all times. <br /> 4. Either the VOC control efficiency shall not be less than 95%, or the total VOC emission rate shall'not ✓ <br /> exceed 2 pounds in any one day. <br /> 5. Sampling ports adequate for extraction of grab samples, measurement of gas flow rate, and use of an FID, <br /> PID, or other District-approved VOC detection device shall be provided for both the influent and the <br /> effluent gas streams. <br /> 6. Laboratory samples shall be taken at the initial inspection, and upon a change in the type of control <br /> equipment under the supervision of the APCD Inspector. Samples shall be taken from both the influent <br /> and the effluent gas stream sampling ports. - <br /> Laboratory samples shall be analyzed for TPH and BTEX. <br /> CONDITIONS CONTINUE ON NEXT PAGE <br /> This is NOT a PERMIT TO OPERATE. Approval or denial of a PERMIT TO OPERATE will be made after an inspection <br /> to verify that the equipment has been constructed in accordance with the approved plans, specifications and conditions of this <br /> Authority to Construct, and to determine if the equipment can be operated in compliance with all Rules and Regulations of the <br /> San Joaquin Valley Unified Air Pollution Control District. YOU MUST NOTIFY THE DISTRICT COMPLIANCE DIVISION <br /> AT(209)545-7000 WHEN CONSTRUCTION OF THE EQUIPMENT IS COMPLETED_ Unless construction has commenced <br /> pursuant to Rule 2050, this Authority to Construct shall expire and application shall be cancelled two years from the date of <br /> issuance. The applicant is responsible for complying with all laws, ordinances and regulations of all;other governmental agencies <br /> which may pertain to the above equipment. <br /> DA L. CROW, EXECUTIVE DIRECTOR/APCO <br /> JNorth <br /> r,,ginalOffice <br /> DIRECTOR OF PERMIT SERVICES <br /> *4230 Kiernan Ave., Suite 130 *Modesto, California 95356 '"(209)545-7000*FAX(209)545-8652 <br /> lonrr INS"P ttvn nor eeQWV_rP e9Pr.T-17.-WMTW ' <br /> I' <br /> f).roma vrtswneo reoe:. <br /> 919'd dnow 2l3iUMN0310 1 cl9T:TO 86, TF, 100 <br />