Laserfiche WebLink
•,i 5�'�.i� ;Fi X14�.��„ E io - <br /> 6. <br /> ��� i s Pete Wilson <br /> Cal EPA i7 1 0 1 Governor <br /> June 9, 1998 <br /> State Water <br /> Resources <br /> Control Board <br /> Division of Ruiz Grocery <br /> Clean Water 4491 Durham Ferry Rd W <br /> Programs Tracy, CA 95376 <br /> Mailing Address: <br /> P.O.Box 944212 PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 1697, <br /> Sacramento,CA <br /> 94244-2120 SITE ADDRESS-. 4491 DURHAM FERRY RD W,TRACT, CA 95376 <br /> -2014-T Street; .t.-_� �—.. _y; - �have reviewed your request,received on May 29, 1998, for pre-approval of corrective action costs. <br /> Suite 130 S rental is not to <br /> Sacramento,CA With the following provisions,the total cost pre-approved for a six-months SVE/A <br /> 95814 exceed $20,200. The pre-approved amount includes costs for the rental of a Stealth Bobcat Catalytic <br /> (916)227-6010 Oxidizer and a Becker Air Sparge System, startup, training, delivery, and pickup. At the end of six <br /> FAX(916)227530 <br /> months of operation,you are required to evaluate the system effectiveness and reporting the results to <br /> World wide Web the County and the Fund. <br /> http://www.swreb.ca. <br /> govi--cwphome/ <br /> fundhome.htm Be aware that this pre-approval does not constitute a decision on reimbursement: all reasonable and <br /> necessary corrective action costs for work directed-and approved by the County will be eligible far <br /> reimbursement per the terms of your Letter of Commitment at costs consistent with those pre-approved <br /> in this letter. <br /> All future costs for'corrective action must be approved in writing by Fund staff. Future,costs for <br /> corrective action must meet,the requirements of Article 11, Chapter 16, Underground Storage Tank <br /> Regulations. <br />{ • The actual costs and scope of work performed must be consistent with the pre-approval for it to <br /> t remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality'Control <br /> '�. Board. <br /> If a different scope of work becomes necessary, then you must request pre-approval of costs on <br /> the new scope of work. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval <br /> before you will be reimbursed. To make this easier, ensure that your consultant prepares his <br /> invoices to match the format of the original estimate, and provides,reasonable explanations for <br /> any-'changes made in the scope of work. When the invoices are submitted you'must include copies <br /> i of all:. <br /> • subcontractor invoices;, <br /> technical reports, when available,,and <br /> applicable correspondence from the County. <br /> f - <br /> I can be reached at (916) 227-6010 should you.have any questions. <br /> Ocir mission is to preserve and enhance the quality of California's water resources,and <br /> J* <br /> Recycled Paper ensure their proper allocation and efficient use for the benefit of present and future generations. <br /> r <br />