Laserfiche WebLink
Working to Res?nrure _ <br /> 3164 Gold Camp Drive, Suite 200 13 <br /> Rancho Cordova, CA 95670 <br /> Phone (916) 852-6690 <br /> Fax (916)852-6688 SITE SAFETY PLAN No. 123020-SSP <br /> SUBSURFACE ENVIRONMENTAL. INVESTIGA'T'ION <br /> at the <br /> Ruiz Grocery <br /> 4491 West Durham Ferry Road <br /> Tracy, California <br /> (September fly, 1993) <br /> ENTROD hC' EON <br /> This Site Safety Plan describes basic safety requirements for the subsurface environmental <br /> investigation The provisions set forth in this Plan apply to the employees of RESNA <br /> Industries and its subcontractors working on this phase of the protect. The subcontractors <br /> may elect to modify these provisions, but only to upgrade or increase the safety <br /> requirements, and only with the concurrence of RESNA Industries, as designated and <br /> accepted in writing <br /> This Site Safety Plan will address the expected potential hazards that may be encountered <br /> on the worksite for this project Field activities are planned to begin on October 18, 1993, <br /> with the duration estimated at approximately 365 days after the start date If changes in site <br /> or working conditions occur as activities progress, addenda to this plan will be provided by <br /> RESNA Industries. <br /> AU7HORI['IITY FOR SA'L'E SAFETY <br /> The RESNA Industries personnel responsible for project safety are the Project Manager and <br /> the Staff Geologist or Engineer The Health and Safety Coordinator is responsible for the <br /> overall RESNA Industries Health and Safety Program and may choose to audit the site for <br /> compliance and take appropriate action to correct deficiencies The Project Manager is <br /> responsible for implementing the provisions of this Plan, for providing a copy of this Plan <br /> to the Staff Geologist or Engineer, and for advising the Staff Geologist or Engineer on <br /> health and safety matters The Project Manager and Staff Geologist or Engineer have the <br /> authority to audit site activities for compliance with the provisions of this Plan They may <br /> suspend or modify work practices or dismiss subcontractors whose conduct does not meet <br /> the requirements specified in this Plan. <br />