Laserfiche WebLink
LEARWATER <br /> U R 0 U P <br /> Eavnanmenla! Srrvocrs <br /> Project Status and Recommendations <br /> The results of this sampling event corroborate results for the first quarter 2001, which indicated that the <br /> residual dissolved-phase plume has attenuated to nearly background levels and no contaminants <br /> exceed California drinking water MCLS <br /> The roadway and shoulders along the intersection of Bird Road and West Durham Ferry Road is <br /> scheduled be resurfaced starting April 16, 2001 Several monitoring wells are 1n locations that might be <br /> covered during this roadwork <br /> Based on these conditions, Clearwater recommends expedited regulatory case closure, so that well <br /> destruction can be accomplished prior to scheduled road and shoulder improvements at the site <br /> ZB107C GWMR 2Q01 5 April 9,2001 <br />