My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006547
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
4491
>
3500 - Local Oversight Program
>
PR0544625
>
ARCHIVED REPORTS XR0006547
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 8:07:46 PM
Creation date
7/3/2019 4:43:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006547
RECORD_ID
PR0544625
PE
3528
FACILITY_ID
FA0003113
FACILITY_NAME
ZAPIEN MARKET
STREET_NUMBER
4491
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25504003
CURRENT_STATUS
02
SITE_LOCATION
4491 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R R GROUP, rsc <br /> �T <br /> CLEA 'Fie",d Procedures <br /> a;roundwater N15,n and gamliling <br /> bbing do,tinhal.. <br /> of SC17 } 1n a rust <br /> ro�edi.res �onscd} do'Nn <br /> atsd sa 1s4 <br /> Decontamination p urging AunsPs u_ Anv non-dedicated <br /> 1s established �h oily P head tube and <br /> MI n� area umPe`l thr°u� if the latter is reg}u^red sslxs on <br /> + ndwa r a decontamination vash solo;tort IS g water new or dedic aced <br /> to beginning snluttan`Kash( otable water�irsdng aiP ed <br /> pumF <br /> prior p4lconax rinse o1 p water <br /> equipment In an d a Second prior to use When with an electronic <br /> Diable water an mated p pl feet during Clearwater s <br /> rinse of p decontam the nearest 4 ver and o,yell <br /> hole equipment is is used IS measured to ro ect mi"' alder o f mcreas�n� base <br /> ear at the request of rile p 7 $eparate-p <br /> Polyethylene tubing the static water level establcah a reliable ating <br /> a well. per� xt'"4 wl,icll to vr-11 if t�lo and the thiel Hess <br /> sampling easured ante P �allal7le aged between each pr electronic 0aller robe <br /> Prior to purging and is typically m en-ended p and no <br /> Depth to bottom cal artalyucal data are t1b adecantatts n 6 a clear, op with an electronic tnturf�ed <br /> sounder If 3455[4751 e will be usin: <br /> ursst to a site oder and tap is collecte Iternatrlely be Measuredg is not addition <br /> ali} P titled by the <br /> first the water sou or observed, Sl'IISPH ntav a1 during P therwtsu sP o roduct <br /> are suspe,.ted the bailer before or nYe sampled unless o and 1loatins P <br /> contamination SPH} feet In e5s of g ro been • eaSurenlents <br /> hydrocarbons ( nearest 0 0 a measurable tbickn a hydracashan water levo l m <br /> is measured to the <br /> hwell containing Wells containing fegrtty as 'ell as <br /> Any monitoring Pram that well `yell in form <br /> collected such as e[aleutattcsrts Ph5 sic al <br /> sample 15 pield observatio�sDatalPurg eristaitic pump If the <br /> ,to]ect manager Gaugtn� or a P assess <br /> azo Hated an the VC bailer submersible pumpurging activities to salinity <br /> thicknesses during P solved axyven turbidity a <br /> is urged ti el, a P monitored as drssol is defined as <br /> ° usin` ur e water ase Stabilit ode <br /> led P the p g eters such y Pa centiy. <br /> T samp uired param ity is ach5eved tun l Q dP�rr - <br /> duLlwell to be and conductivity) o uifet 1f iea arasneter stabiles and less ch €roi the b31lcr <br /> path monitoring Cemperature of the ail terra decanted <br /> eters (pH resentanve re,entatC i P <br /> am le at least four ttzne5 <br /> param les are considered reF cnndticutiit} tom a discreet s �rieasurea <br /> wa.er <br /> $ample collected tssamP n LQ°la chane tin measured tnpararrieters are well cz�i^` <br /> iso measured units,less tha parameters are wh cell uniil three rychar'e may be <br /> etc area <br /> to temperature in-itne fYowthrou_ puTe}ng continueroe Data <br /> Clian le cif less ahr t- pChang- water or it1 a ,ve}1 vnluane onstrate a slow on the Pu the Purge ualc of one Wells which dewater or dem is recorded stored an site in <br /> `1 8 degrees pahshe rest of -it ua3unie anter dewaters ing information labeled and Sal €acllsty <br /> $eParately from Ietely oved well purg is sealed. roprlate di5go <br /> initially a d well cutup ve been rem daily Purge water cued to ars 2W <br /> during our-in <br /> removed or until the es iia <br /> remo three well volute calibrated neater ss rem <br /> have beenthan <br /> arametcrs are ;tally profiled,tt e <br /> sampled after fewer sed to measure P being chem well <br /> All meters tlaLLou dx,�ms After when the <br /> sheet rovedS_� e rate, de for at <br /> D d r-app hauler exceeds well recharge <br /> ed to rechar� <br /> waste it urging rate Well is led within 24 <br /> by a licensed urg g or, P slow, the well is samp P cell <br /> after P in e cuemely S The tO th� <br /> ' 1le r immediately if recharge is for sarnplinn <br /> f» wa e e collected water level rriulated zttiver disposable ar decl'cmost sensitive to <br /> les ar volume has arca bailers, Zed for compounds labeled, <br /> Groundwater samp of its static olyethylenc a analy lied <br /> ed to at least SO�Io les bele= supe containers, <br /> bas re;_ racticable, or until suCfsC011ected using P Same laboratory- analysicai laboratory <br /> hours, if P bed Samples ar tubing appropriate art to a state-certified <br /> feast two or 1epusF the penstalti 1 Puare placed in r fo transP utdelines <br /> hours of puxg'n, Water Same cooler for resional $ <br /> les may also be collected from laced on ice fist a rele4ant local of <br /> samp are col]ecf c fust <br /> farm and PandardS required by <br /> volatilization a chain of custody {field <br /> documented on is match or surFaSs procedures in the <br /> docum following p <br /> p,nalytical detection imi adhere to the <br /> r les.CGI personnel of <br /> Of the samp each well Q degree <br /> i in3tiOn to sampling order of increastn' <br /> To prevent contain tit on prior in the expected <br /> air of latex gloves are P are collected <br /> A new, clean P rac,dures pSSeti`tously <br /> ed and groundwater samples ustng the P <br /> purg al tical results well, <br /> wells are <br /> gauged,ased On historical an y decontaminated between each <br /> contamination be thriroughLy <br /> li the sample is minima the <br /> eplutprnent will Passing throug slowly running <br /> All Qur�ng n of this section the amount of air Pie bottles are filled b3 -ihe ltd rs carefully <br /> deScnbed at the begirins g its, Samp oaths the bottle is removed <br /> volatile orgamc analy the vratcr Present <br /> the Cap <br /> volatile meniscus over the {f a bubble rs p <br /> le Collthe ail f Dam striPPIns the <br /> ` During samp ere is a within the battle <br /> Th1s helps prevent resent <br /> 1e down the side of eh bottle <br /> �rlbubbfes are p <br /> samp bottle Such 'v 12, 1999 <br /> screwed Onto the revtse'd lu' <br /> t <br /> ct,��.1tWA�tt Gsatss',1•yG-(�w51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.