Laserfiche WebLink
CLEARWATER <br /> G R 0 U P [ \ C <br /> eno[roRmrn[al Srrneces <br /> TABLE OF CONTENTS <br /> 1 0 INTRODUCTION 1 <br /> I I Site Background 1 <br /> 2 0 GROUNDWATER MONI'I'0R1NG 2 <br /> 2 1 Field Activities and Laboratory Methods 2 <br /> 2 2 Groundwater Monitoring Results 2 <br /> 2 3 Groundwater Monitoring Recommendations 3 <br /> 3 0 WORKPLAN FOR CONFIRMATION SOIL BORIINGS 4 <br /> 3 1 Proposed Scope of Work 4 <br /> 3 2 Field Methods 4 <br /> 3 3 Analytical Methods 5 <br /> 3 4 Reporting 5 <br /> 4 0 CERTIFICATION 6 <br /> TABLES <br /> Table 1 Well Construction Specifications <br /> Table 2 Groundwater Elevations and Sample Analytical Results <br /> FIGURE <br /> Figure 1 Site Location <br /> Figure 2 Site Plan <br /> Figure 3 Groundwater Elevation Map- 11/2199 <br /> Figure 4 Hydrocarbon Distnbution and Benzene Isoconcentration Map- 1112199 <br /> Figure 5 Proposed Confirmation Boring Locations <br /> Figure 6 Cross Section A-A' with Pre-Remediation Distribution of Soil Contamination <br /> and Proposed Confirmation Borings <br /> APPENDICES <br /> Appendix A Clearwater Field Protocols <br /> Appendix B Clearwater Gauge/Purge Calculations and Well Purging Data Sheets <br /> Appendix C Laboratory Reports and Chain-of-Custody Forms <br />