Laserfiche WebLink
CLEARWATER <br /> Ertvirartmrn ra! �.rr+ccs <br /> 3.0 WORKPLAN FOR CONFIRMATION SOIL BORINGS <br /> 3 1 Proposed Scope of Work <br /> The purpose of the proposed work is to demonstrate that the SVE /AS system operation and remo,�al of 7,377 lbs of <br /> gasoline from the subsurface resulted in a significant reduction in gasoline contarrunants in soil beneath the site To <br /> accomplish this goal, four soil borings will be dnlled in the area of the former UST system and in areas of previously <br /> known vadose zone/capillary fringe contamination (Figure 5) Soil samples collected from zones of previously known <br /> contamination will be retained for laboratory analysis Analytical results for these samples will be compared to those <br /> collected during UST removal and initial site investigation phase to determine efficacy of clean-up <br /> All work will be conducted in accordance with the LUFT Field Manual. the Tri-Regional Board Staff Recommendations, <br /> and Article I 1 Corrective fiction Regulations of Chapter 16 Under Storage Tanks Regulations Specific project tasks are <br /> summarized below <br /> 3 2 Field Methods <br /> Prior to drilling, Clearwater will prepare site specific Health and Safety Plan for drilling activities Prior to conducting <br /> and drilling, the site will be marked by Underground Service Alert (USA) to identify utilities leading to the site <br /> Appropriate drilling permits will be obtained from the SICPHS/EHD prior to drilling All fieldwork will be conducted in <br /> accordance with Clearwaters Field Protocols (attached) <br /> The bonngs will be advanced in locations where contamination was previously observed or documented in order to <br /> compare pre- and post-remediation contaminant levels Confirmation borings CB-I and CB-2 will be drilled in the <br /> locations of the former south UST and the former dispenser island, respectively (Figure 5) Due to access constraints <br /> (low overhead), a boring cannot be drilled exactly in the location the second forrner UST Howe-,er. boring C13-2 is <br /> located with several feet from the side of the former north UST, and therefore will suffice for reassessment of that area <br /> TPHg levels were reported to have been greater than 10,000 mg/kg in soil samples collected from the base of the <br /> excavations during UST removal at a depth of 10 feet bgs Additionally,previous assessment data from 1IW-2, RW-I <br /> and VW-3 indicated that TPHg concentrations at a depth of approximately 15 feet bgs ranged between 450 and 700 mg/kg <br /> (Figure 6) <br /> The remaining two confirmation borings,CB-3 and CB-4,will be located near VW--I and MW-1,respectively Although <br /> no soil sample data exist for this area,drilling observations/OVM readings and the previous presence of SPH in the area <br /> of MW-1 suggest that TPHg concentrations were elevated at depths between 10 and 15 feet bgs, the histoncal range for <br /> groundwater fluctuation For the sake of comparison,it is assumed that pre-remediation TPHg concentrations in this area <br /> were also likely between 450 to 700 mg/kg(Figure 6) <br /> A direct push drill ng will be used to advance the confirmation bonngs Drilling will be performed by a C-57 licensed <br /> driller under the supervision of a Clearwater geologist It is assumed that the four boring will be drilled to a maximum <br /> depth of 15 feet bgs During drilling,soil samples will be collected at five-foot intervals Soil types will be documented, <br /> as well as depth to groundwater, if encountered Soil samples will be collected in accordance with local regulatory <br /> D-107 4Q99 GW&WP Confirmation Borings 4 November 15 1999 <br />