My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006550
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
4491
>
3500 - Local Oversight Program
>
PR0544625
>
ARCHIVED REPORTS XR0006550
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 8:22:54 PM
Creation date
7/3/2019 4:45:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006550
RECORD_ID
PR0544625
PE
3528
FACILITY_ID
FA0003113
FACILITY_NAME
ZAPIEN MARKET
STREET_NUMBER
4491
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25504003
CURRENT_STATUS
02
SITE_LOCATION
4491 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CATALYTIC-OXIDIZER EXHAUST <br /> (OUT OF SYSTEM) <br /> CATALYSTEXIIAUST PHECOM1IBUSIION <br /> fEMPERATURE fLMPERATURE AFTER <br /> (DIGITAL READ OUT (DIGITAL READ OUT <br /> ON CONTROI PANEI ON(ONTROL PANLL <br /> EFFLUENT 1125 F MAX) 65a F MIN) <br /> (OXIDIZER EXHAUST <br /> SVE GAS SAMPLE PORT) <br /> (INTO SYSTEM) <br /> p N Nyy ]J 32 <br /> m to HEAT <br /> EXCHANGER <br /> ELECTRIC <br /> HEATER <br /> T1 <br /> TEMPERATURE AFTER <br /> OXIDIZER HEAT EXCHANGER <br /> PRESSURE (5u650 F) PRESSURE ACROSS FLOW SENSOR <br /> GAUGE ORIFICE PLATE (DIGITAL READ-OUT INFLUENT <br /> (0 60 IN W C) )U IU IN W C) IN CONTROL PANEL) <br /> (OXIDIZER INLET <br /> TTTSAMPLE PORT) <br /> 3 PIPE 2' p 1 V I <br /> 3 PIPE <br /> 3 PIPE <br /> MANUAL DILUTION <br /> AIR VALVE DILUTION <br /> (BALL) AIR VALVE <br /> (AUTO <br /> CONTROLLED <br /> BUTTERFLY) l <br /> MOISTURE (-) W <br /> KNOCKOUT A V <br /> `< : PROCESS <br /> ISOLATION VALVE AVAILABLE <br /> VACUUM <br /> (AUFFU- <br /> ,Q ro CONTROI I FD GAUGE BLOWER <br /> s3 m BUTTERFLY) <br /> (0-30 IN }EG) <br /> SVE GAS <br /> (INTO SYSTEM) <br /> SVE SYSTEM PROCESS FLOW DIAGRAM CLEARWATER GROUP, INC. <br /> Ruiz Grocery <br /> 4491 West Durham Ferry Road Project No Figure Date Figure ' <br /> Tracy, California D-107 10198 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.