My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006550
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
4491
>
3500 - Local Oversight Program
>
PR0544625
>
ARCHIVED REPORTS XR0006550
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 8:22:54 PM
Creation date
7/3/2019 4:45:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006550
RECORD_ID
PR0544625
PE
3528
FACILITY_ID
FA0003113
FACILITY_NAME
ZAPIEN MARKET
STREET_NUMBER
4491
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25504003
CURRENT_STATUS
02
SITE_LOCATION
4491 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I � <br /> CLEARWATER <br /> u R O L P I \ L <br /> Envy anmrnful Se rz, 9 <br /> in mid 1998 in accordance with Clearwater's Problem Assessment Report, Feasibility Study, and Remedial Action Plan <br /> dated February 21, 1996, Revised Remedial Action Plan dated November 12, 1996, and Constructions Specifications <br /> dated March 28, 1997 The system was tested on September 28, 1998 for initial compliance testing according to the <br /> SJVUAPCD ATC permit#N-3868-1-0(Appendix D) Mr Craig Mitchell,the SJVUAPCD representative, was present <br /> on-site to witness verification testing Results of the verification testing indicated that the system was operating within <br /> compliance of the permit, and the remediation system was restated for full operation on October 7, 1998 Results of <br /> initial system testing were presented to Clearwater's letter report dated October 1, 1998 <br /> 3 1 Operational Data -- Soil Vapor Extraction, and Treatment <br /> Petroleum hydrocarbon vapors extracted from soil and groundwater are treated by a Solleco ECAT 250 all electric <br /> catalytic oxidizer(catox) <br /> In accordance with the SJVUAPCD PTO permit#N-3868-1-0 (Appendix D), the influent and effluent air streams for the <br /> catox unit were analyzed for contaminant concentrations (TPHg and BTEX)on a monthly basis Catox operational data <br /> and analytical results of influent and effluent samples are presented on Table 3, and the SVE/AS process flow diagram is <br /> shown on Figure 6 Cumulative analytical results of vapor samples collected from the catox influent and effluent streams <br /> are presented on Table 4 The following is a summary of the operational data and analytical results of samples from the <br /> SVE process stream for this monitoring period <br /> • Monitoring date Influent/effluent sampled on 7/191199, 8110/99, and 9/13/99 <br /> • Operational Hours 1,676 hours this period and 6,638 to date <br /> • Sys up time this period 83% <br /> • Influent air flow rate 157 sefm(7/19/99)to 170 scfm(9/13/99) <br /> • Influent air TPHg 28 mg/m3 (8/10199)to 23 mg/m3(9/13/99) <br /> • Effluent air TPHg <10 mg/m3(7/19, 8/10, and 9/13/99) <br /> • Destruction efficiency >54 517c (7/19/99) to>63 4% (8/10/99) <br /> • TPHg recovery rates 0 01 lbs/hr(8/10/99)to 0 03 lbs/hr(7/19/99) <br /> • Total TPHg recovery 33 lbs (5 4 gal)this period and 7,377 lbs(1,209 gal)to date <br /> • TPHg emission rates <0 01 lbs/hr(7/19, 8110, and 9/13/99) <br /> • Operating wells VW-1 to VW-4, MW-1,and RW-1 <br /> • Analytes tested TPHg and BTEX <br /> • Analytical methods EPA Methods 8015 (modified)and 8020 <br /> • Laboratory Entech Analytical Labs,Inc , Sunnyvale,CA(CA FLAP#2224) <br /> The TPHg recovery rate is based on analytical influent air sample results and concurrently measured air flow The <br /> average TPHg recovery rate for each month is multiplied by hours of operation for that period to calculate TPHg removal <br /> for the period between each sampling event <br /> D-107 3Q99 GW&Sys Mon Report 3 September 29, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.