My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2150
>
2800 - Aboveground Petroleum Storage Program
>
PR0543790
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2019 1:19:55 PM
Creation date
7/8/2019 11:12:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543790
PE
2832
FACILITY_ID
FA0006045
FACILITY_NAME
TCI LEASING AND RENTAL
STREET_NUMBER
2150
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
2150 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TCI Transportation Spill Prevention, Control, and Countermeasure (SPCC) Plan <br /> Commodities, Inc <br /> Part 1 : Plan Administration <br /> 1.1 Management Approval and Designated Person (40 CFR 112.7) <br /> TCI Transportation Commodities, Inc is committed to preventing discharges of oil to navigable <br /> waters and the environment, and to maintaining the highest standards for spill prevention <br /> control and countermeasures through the implementation and regular review and amendment to <br /> the Plan. This SPCC Plan has the full approval of TCI Transportation Commodities, Inc <br /> management. TCI Transportation Commodities, Inc has committed the necessary resources to <br /> implement the measures described in this Plan. <br /> The Facility Manager is the Designated Person Accountable for Oil Spill Prevention at the <br /> facility and has the authority to commit the necessary resources to implement this Plan. <br /> Facility Manager(facility response coordinator): Andrew Marrujo <br /> Signature. <br /> Title. Service Manager <br /> Date: September 7, 2019 <br /> 1.2 Professional Engineer Certification (40 CFR 112.3(d)) <br /> The undersigned Registered Professional Engineer is familiarwith the requirements of Part 112 <br /> of Title 40 of the Code of Federal Regulations (40 CFR part 112) and has visited and examined <br /> the facility, or has supervised examination of the facility by appropriately qualified personnel. <br /> The undersigned Registered Professional Engineer attests that this Spill Prevention, Control, <br /> and Countermeasure Plan has been prepared in accordance with good engineering practice, <br /> including consideration of applicable industry standards and the requirements of 40 CFR part <br /> 112; that procedures for required inspections and testing have been established. and that this <br /> Plan is adequate for the facility. <br /> This certification in no way relieves the owner or operator of the facility of his/her duty to prepare <br /> and fully implement this SPCC Plan in accordance with the requirements of 40 CFR part 112. <br /> This Plan is valid only to the extent that the facility owner or operator maintains, tests, and <br /> inspects equipment, containment, and other devices as prescribed in this Plan. <br /> Professional Engineer Registration M36728 <br /> Signature: dK. A,= Number. <br /> Name: Jared Shuman, PE Tale: Consultant QxosEss�o.,. <br /> Company. Pacific Management Services Date: September P^, 2019 <br /> M 3672a Ta n <br /> . E75Q3L31C10 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.