My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NEWTON
>
3931
>
2800 - Aboveground Petroleum Storage Program
>
PR0515675
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 8:01:47 PM
Creation date
7/8/2019 3:30:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515675
PE
2832
FACILITY_ID
FA0009366
FACILITY_NAME
GILLIES TRUCKING INC
STREET_NUMBER
3931
STREET_NAME
NEWTON
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
13207017
CURRENT_STATUS
01
SITE_LOCATION
3931 NEWTON RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for GILLIES TRUCKING INC as of July 08, 2019. <br /> Open violations from September 26,2018 inspection <br /> Violation#102-Failed to prepare a written SPCC Plan in accordance with CFR Part 112. <br /> This facility has an Aboveground Petroleum Storage Act(APSA)regulated shell capacity of over 10,000 gallons. A <br /> Spill Prevention, Control, and Countermeasure(SPCC) Plan was not available on site. All facilities which have an <br /> APSA regulated shell capacity of 1,320 gallons or greater shall prepare a written SPCC Plan which meets all of the <br /> requirements of the 40 CFR Part 112. This plan shall be certified by a professional engineer in accordance with 40 <br /> CFR 112.3(d). Immediately prepare a SPCC Plan in accordance with 40 CFR Part 112,which that includes all <br /> aboveground petroleum storage containers 55 gallons or larger. Submit a copy of the Professional Engineer(PE) <br /> certified SPCC Plan to the EHD for review. (This copy will be returned to the facility after review.) A copy shall be <br /> maintained on site at all times. <br /> Violation#613-Failure to provide appropriate secondary containment,diversionary structures or <br /> equipment. <br /> The 500 gallons used oil tank outside of the shop, a 55 gallon drum inside the shop with new oil and a 260 gallon <br /> new oil tank were observed without secondary containment. A facility shall provide appropriate containment and/or <br /> diversionary structures or equipment to prevent a discharge. The entire containment system, including walls and <br /> floor, must be capable of containing oil and must be constructed so that any discharge from a primary containment <br /> system will not escape the containment system before cleanup occurs. Immediately provide adequate secondary <br /> containment for all aboveground petroleum storage containers larger than 55 gallons. <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.