Laserfiche WebLink
P°s"' STI SP-001 INSPECTION <br /> POWERS e°"" "� '° <br /> FF 707 9]6V GILLIESTRUCKIN3 $TOCKTON,CA <br /> FP%]0]B32 Y2Bi <br /> ENGINEERING&INSPECTIOJ,INC. wwwY- Diesel Tank <br /> 2.3 Annual Inspection Checklist <br /> General Inspection Information <br /> 1. Inspection Date: 01/08/2019 <br /> 2. Retain Until Date(36 months from inspection date): 01/08/2019 <br /> 3. Prior Inspection Date: N/A <br /> 4. Inspector(s)Name(s): Jewel Geronimo <br /> 5. Tanks Inspected(ID#'s): Diesel Tank <br /> 1.0 Tank Containment Status Comment <br /> 1.1 Containment structure in satisfactory condition? Yes Containment should be drained <br /> after a rain storm. <br /> 1.2 Drainage pipestvalves fit for continued service? Yes <br /> 2.0 Foundation and Supports Status Comment <br /> Evidence of tank settlement or foundation <br /> 2.1 washout? No <br /> 2.2 Cracking or spelling of Concrete pad or ring wall? No <br /> 2.3 Tank supports in satisfactory Condition? Yes <br /> 2.4 Water able to drain away from tank? Yes <br /> 2.5 Grounding strap secured and in good condition? N/A No grounding straps <br /> 3.0 Cathodic Protection Status Comment <br /> 3.1 CP system functional? N/A <br /> 3.2 Rectifier Reading: N/A <br /> 4.0 Tank External Coating Status Comment <br /> 4.1 Evidence of paint failure? Yes Isolated coating failure <br /> 5.0 Tank Shell/Heads Status comment <br /> Noticeable shell/head distortions,buckling,denting <br /> 5.1 or bul in ? NO <br /> 5.2 Evidence of shellthead corrosion or cracking? No <br /> STISPWIQ Tv#cN TM SbF Ga8x Wb ° PnM 1 19 <br /> OM9£L lrc <br /> Page 12 <br />